Procurement Annual Report

1 April 2018 to 31 March 2019.

IMAGE: The Orkney Islands Council crest and wordmark appear above the title “Procurement Annual Report” and the date “1 April 2018 to 31 March 2019”.

Contents

  • Definition of Key Terms — 3
  • Introduction — 6
  • Section 1 – Summary of Regulated Procurements Completed — 7
  • Section 2 – Review of Regulated Procurement Compliance — 7
  • Procurement Improvement Capability Programme (PCIP) — 8
  • Internal Audit — 8
  • Contract Standing Orders — 8
  • Procurement Strategy — 9
  • Section 3 – Community Benefit Summary — 9
  • Section 4 – Supported Businesses Summary — 12
  • Section 5 – Future Regulated Procurements Summary — 12
  • Section 6 – Other Information — 13
  • Supplier Development — 13
  • Collaboration and Partnering Opportunities — 13
  • Table 1 – 1 April 2016 to 31 March 2017 — 14
  • Table 2 – 1 April 2017 to 31 March 2018 — 14
  • Table 3 – 1 April 2018 to 31 March 2019 — 15
  • Procurement Annual Spend Data — 16
  • Procurement Spend – National Context — 17
  • Climate Change Duties — 18
  • Biodiversity Duty — 18
  • Appendix 1 — 19
  • Summary of Regulated Procurement carried out 1 April 2018 to 31 March 2019 — 19
  • Appendix 2 — 23
  • Procurement Service Improvement Action Plan 2018 to 2019 — 23
  • Appendix 3 — 42
  • Forward Plan for Regulated and Unregulated Procurements April 2019 to March 2021 — 42

Definition of Key Terms

TermDefinition
Contract.An agreement between the Council and any Contractor made by formal agreement or by issue of acceptance or an official order for Supplies, Services or Works.
Contractor(s).Includes any sole trader, partnership or company (limited or unlimited) or any duly incorporated trade, professional or commercial body.
Delegated Authority.Officers who have been given formal written authority by their Executive Director or Chief Officer to manage procurement exercises within a specified value range on behalf of the Council.
EU Threshold.The threshold for determining the application of the Regulations. In the case of the Procurement (Scotland) Regulations 2016 the threshold is £181,302 (Supplies and Services) and £4,551,413 (Works). In the case of the Utilities Contracts (Scotland) Regulations 2016 the threshold is £363,424 for Supplies and Services and £4,551,413 for Works.
EU Regulated Procurement.Goods, Services or Works contracts with a value over the EU Threshold.
Framework Agreement.An overarching agreement with supplier(s) to establish terms governing individual contracts that may be awarded during the life of the agreement (‘call-offs’), concluded in accordance with Section 34 of the Public Contracts (Scotland) Regulations 2015.
Health and Social Care Services.A public contract or framework for social and other specific services listed in Schedule 3 of the Public Contracts (Scotland) Regulations 2015.
Life-Cycle Costing.All consecutive or interlinked stages, including research and development to be carried out, production, trading and its conditions, transport, use and maintenance, throughout the existence of the product or the works or the provision of the service, from raw material acquisition or generation of resources to disposal, clearance and end of service or utilisation.
Procurement.The process leading to the award of a public contract or framework agreement or establishment of a dynamic purchasing system for the acquisition of works, supplies or services from an economic operator.
Public Contracts Scotland (PCS) portal.The Scottish Government’s official national advertising portal for public sector contract opportunities: https://www.publiccontractsscotland.gov.uk/.
Quick Quote (QQ).An online quotation facility which allows the Council to obtain competitive quotes electronically for: (1) Low value requirements between £10,000 and £50,000; and (2) Unregulated Works Contracts, depending on complexity of contract (as defined in Clause 17).
Quotation.A formal offer to supply or purchase supplies, execute works or provide services where the estimated value of the contract does not exceed £50,000.
Regulated Procurement.As defined by the Procurement Reform (Scotland) Act 2014 and referred to as the Reform Act ‘slice’ a regulated procurement for Goods or Services Contracts with a value of over £50,000 and for Works Contracts over £2,000,000 and less than the relevant Official Journal of the European Union (OJEU) Thresholds.
Regulations.The Public Contracts (Scotland) Regulations 2015, the Procurement Reform (Scotland) Act 2014, the Procurement (Scotland) Regulations 2016 and / or the Concession Contract (Scotland) Regulations 2016 as the context requires, but where the Council is acting as a Harbour Authority and chooses to do so, the Utilities Contracts (Scotland) Regulations 2016.
Supplies.Goods or the hire of goods and for any siting or installation of those goods.
Tender.A formal offer to supply or purchase supplies, execute works or provide services where the estimated value of the contract is £50,000 (excluding VAT) or more.
Unregulated Works Procurement.A contract for Works with a value of between £50,000 and £2,000,000, being a procurement not covered by the Regulations and procured utilising the Council’s database of pre-approved contractors.
Works.Building construction, building maintenance or engineering works.

Introduction

Orkney Islands Council (‘the Council’), provides a range of facilities and services to a community with a population estimated as 22,190 in mid-2018 by the Office of National Statistics. The Council is also the Harbour Authority with a port estate of 29 piers and harbours, a Roads Authority for the islands and operates a network of internal air and ferry services.

The Council provides procurement and related services for a wide range of Works, Supplies and Services with an annual spend, for the financial year 2018 to 2019, of just over £45 million.

The Council operates a devolved model of procurement across five directorates. The central Procurement Services Team is based within Corporate Services and consists of three full-time equivalent staff; a Procurement Manager, a Procurement Officer and an Assistant Procurement Officer. The Procurement Manager’s responsibilities include development of a network of 17 trained and experienced Officers across the Council who are assigned delegated responsibility for the procurement of supplies, services and works.

The Council published its Procurement Strategy, as required by the Procurement Reform (Scotland) Act 2014 (‘the Act’), in January 2019. In order to report compliance with its Procurement Strategy and the Act itself, the Council must publish an Annual report.

There are 11 themes identified in the Procurement Strategy for the period ending 31 March 2019 as follows:

  • Sustainability.
  • Working with suppliers.
  • Value for money.
  • Collaboration and partnering.
  • Governance.
  • Contract management.
  • Communication.
  • E-Procurement.
  • Monitoring and measurement.
  • Guidance.
  • Training.

The six key priority areas where targets have been identified and are attributable for the Procurement Strategy reporting period ending 31 March 2019 remain the same as for the previous year and are as follows:

  • Sustainability.
  • Working with suppliers.
  • Value for money.
  • Collaboration and partnering.
  • Contract management.
  • E-Procurement.

The guidance and template issued by the Scottish Government to report on our performance from 2017 to 2018 onwards has been used for this second Annual Procurement Report.

The reporting period for this second annual report is from 1 April 2019 to 31 March 2019.

In addition to the required information set out in the Act, this report includes performance against several strategic indicators as detailed in the Council’s Procurement Strategy 2019 to 2021.

In order to evidence our progress against our strategic targets and the new duties introduced by the Act, the published Annual Report details the form of measurement taken. The statistics presented in this report provide the evidence which should, over time, show how the Council is progressing against both the national and local objectives. Targets were set in the Council’s Procurement Strategy and progress towards these has been noted in this second Procurement Annual Report.

Section 1 – Summary of Regulated Procurements Completed

Section 18(2) of the Act requires organisations to include ‘a summary of the regulated procurements that have been completed during the year covered by the report’.

As defined by the Act and referred to as the Reform Act ‘slice’ a regulated procurement is for Goods or Services Contracts with a value of over £50,000 and for Works Contracts over £2,000,000 and less than the relevant OJEU Thresholds.

A regulated procurement is completed when the award notice is published or where the procurement process otherwise comes to an end. This includes contracts and framework agreements.

Appendix 1 provides the breakdown of the 50 regulated procurements completed for the reporting period of 1 April 2018 to 31 March 2019.

Section 2 – Review of Regulated Procurement Compliance

All procurement exercised carried out by the Council are required to be carried out in accordance with the Council’s Contract Standing Orders (CSOs) and this is regularly updated to take account of changes in legislation and best practice in procurement.

Prior to the point of contract award, all recommendation reports are required to include a statement that the CSOs have been complied with, therefore full compliance is anticipated. Examples of internal and external review of the Council’s processes and compliance with these processes are detailed in the audit / improvement capability outcomes as follows:

Procurement Improvement Capability Programme (PCIP)

The Council first completed Scotland Excel’s PCIP in July 2017. The PCIP is undertaken every two years and a second PCIP assessment for the Council took place on 3 September 2019. Outcomes and recommendations from this exercise will be incorporated as a process of ongoing procurement improvement.

The objective of the PCIP is to assist the Council to improve its structure, capability, processes and ultimately performance by attaining a level of a procurement performance that is appropriate to the scale and complexity of its business. As part of the PCIP the Council is required to demonstrate a prudent and well-planned approach to defining its supply needs. Assessment of the Council’s procurement improvement capability is carried out every two years by Scotland’s Centre of Expertise Scotland Excel and covers procurement activities carried out by the Council’s Officers with Delegated Authority in the Procurement, Capital Projects, Facilities and Engineering Teams.

Internal Audit

An internal audit of procurement was carried out in 2016 / 2017 with a final report issued in September 2017 which reviewed procurement activities in the Council in the light of the new regulations. The review was very positive in general with recommendations all of medium priority which included completion of the review of the Sustainable Procurement Policy, the Procurement Manual, the Council’s Standard Terms and Conditions, referencing updates within the Council’s Financial Regulations in line with the Council’s CSOs and to instigate a process for review of access rights for the Officers with Delegated Procurement Authority. All of the recommendations have been implemented. There has been no further audit of procurement carried out in the reporting year of 2018 to 2019.

Contract Standing Orders

The Council’s CSOs were updated, revised and published in June 2016 to include the provisions of the Act and the Procurement Scotland Regulations 2016. The CSOs were also updated to include recommendations of an internal audit on procurement at the Council.

The CSOs were approved by General Meeting of the Council 5 July 2016 and were then updated further in October 2017 and March 2018 respectively to reflect an additional procedure to ensure there is documentation to evidence that there are no conflicts of interests for evaluation team member and to update the EU Threshold for procurement. Changes to the CSOs were highlighted to Senior Managers and key procurement staff and within the organisation by way of the Procurement Services Bulletin.

The CSOs are currently out for consultation and an updated version is anticipated to be issued prior to the end of 2019.

Procurement Strategy

The Council’s current Procurement Strategy was published in January 2019 for the following two years and three-month period to 31 March 2021. This version brings the Procurement Strategy in line with the ongoing annual reporting requirements.

Appendix 2 attached to this report is the Procurement Service Improvement Action Plan contains the Procurement Strategy targets set and progress made over the last financial year.

Section 3 – Community Benefit Summary

The Council has a Sustainable Procurement Policy. This policy sets out the general principles that the Council will follow across all its procurement and commissioning activities to ensure that it is undertaken in a sustainable manner.

This Policy also sets out how the Council will plan and manage its procurement activities to meet the Council’s corporate aims and objectives and comply with regulatory and legislative requirements. Finally, the policy supports the Council’s commitment to sustainable procurement which is set out in the Council’s Corporate Procurement Strategy 2019 to 2021:

https://www.orkney.gov.uk/Service-Directory/P/procurement-strategy-2019-to-2021.htm

It is intended for all of those who are involved in, or affected by, the Council’s procurement activities throughout our community and beyond. The Council spends tens of millions of pounds each year on a diverse range of goods, services and works from third parties. It is important therefore that this spending power is used to support key Council objectives. The Sustainable Procurement Policy has been developed to help the Council to meet its legal duties and to deliver its key strategic objectives available at the link below:

https://www.orkney.gov.uk/Files/Business-and-Trade/Sustainable_Procurement_Policy.pdf

Sustainable procurement supports the Council’s values, as outlined in Orkney Islands Council Plan 2018 to 2023 and the Council’s Delivery Plan 2018 to 2023:

https://www.orkney.gov.uk/Council/C/corporate-strategic-plan-2018-2023.htm

https://www.orkney.gov.uk/Files/Council/Council-Plans/OIC_Delivery_Plan_2018_2023.pdf

The Strategic Themes identified are as follows:

  • Connected Communities.
  • Caring Communities.
  • Thriving Communities.
  • Enterprising Communities.
  • Quality of Life.

The Policy outlines how sustainable procurement supports and contributes to the implementation of the Council’s Delivery Plan 2018 to 2023.

Community benefits must be considered for all procurement processes at or above £4 million in value to meet the Council’s requirement to meet the sustainable procurement duty.

For each individual regulated procurement exercise, Officers with Delegated Procurement Authority must complete a ‘Commodity Strategy for all Regulated Procurements’ which includes a section on Community Benefits to be considered where applicable.

During the reporting period covered by this Procurement Annual Report three procurements, where Community Benefits for procurements with a contract value over the £4,000,000 threshold, have been included and have been carried out by the Council.

These Procurements are as follows, and have either been completed or remain ongoing with the reporting period for this annual report:

Date of AwardSubject MatterEstimated Value (£)Start DateEnd Date
13/02/2017Framework agreement for the Provision of personalised care and support services in Orkney for Individuals with Complex Needs.4,000,000.0013/02/201712/02/2021
08/09/2017New Stromness Care Facility.7,276,005.0301/09/201710/08/2019
01/02/2019Supply of Two New Towage Boats.12,000,000.0011/02/201911/08/2019

A summary of the Community Benefits included in the award criteria for the procurements included within the reporting period, and those in procurements that are not concluded yet, are as follows:

  • Employment (skills and training, small or medium-sized enterprises (SMEs) / social enterprises / supported businesses).
  • Fair Work Practices.

Monitoring of Community Benefits for exercises before this year have continued as planned.

In the instance of the provision of Personalised Care and Support Services contracts resulting from the framework agreement (awarded 13 February 2017), reporting of community benefits achieved are contained within quarterly contract management meetings for each individual contract. Contracts are awarded throughout the life of the framework and will vary according to each contract where relevant.

For the Stromness Care Home construction project (awarded 8 September 2017) contract management meetings are held on a regular basis with the Contractor. Progress made towards the targets set for the Stromness Care Home are recorded at each monthly meeting.

The following factors are routinely taken into consideration in relevant procurements, especially in construction or social care procurement. However, these may not always be specifically labelled as a Community Benefit Award Criteria:

  • Climate change (carbon and energy consumption, carbon in production, adaption, carbon in vehicle emissions).
  • Materials (scarcity, security).
  • Waste (production, reuse / recondition / remanufacture).
  • Hazardous materials / emissions.
  • Bio-diversity (protection and enhancement).
  • Heritage (protection and enhancement).
  • Water (consumption and production).
  • Employment (skills and training, SMEs / social enterprises / supported businesses).
  • Communities.
  • Fair and ethical trading (working conditions, conflict materials).
  • Equality (protected characteristics).

There has been an increase in the inclusion of Community Benefit Clauses over the past financial year as recorded in the Procurement Strategy Improvement Plan, attached at Appendix 2.

Following the legislative changes, and as recorded for the previous two financial years on the Council’s On-Contract Spend Register, there have been a total of nine procurements undertaken in the 2016 to 2019 reporting period where Community Benefit Clauses have been part of the award criteria.

For procurement of Category C (local contract / framework including local collaborative framework agreements) Contracts which are undertaken by the Council, it is now routine for Community Benefits to be included as part of the award criteria where the value of the contract is over £4 million.

Where the Council can access Category A (national collaborative) contracts or Category B (sectoral collaborative) contracts via Framework Agreements the overall anticipated value of the Framework is inevitably of a high value and likely to be over the £4 million threshold for the inclusion of community benefits.

Contracts awarded under Framework Agreements are likely to achieve Community Benefits. However, for contracts awarded via a Framework Agreement it is more difficult to identify Community Benefits which will be realised locally, except where the local supply chain is involved in the delivery of the Contract.

Community Benefit Analysis: 1 April 2018 to 31 March 2019

Community Benefit Analysis1 April 2018 to 31 March 2019
Number of Contracts Community Benefit Clauses is applicable to.2
Number of Applicable Contracts with Community Benefit Clause.2
Percentage of total Applicable Contracts with Community Benefit Clauses.100%

Section 4 – Supported Businesses Summary

The Act (http://www.legislation.gov.uk/asp/2014/12/section/18) included a new classification for supported business, and defined a supported business as ‘an economic operator whose main aim is the social and professional integration of disabled or disadvantaged persons and where at least 30% of the employees of the economic operator are disabled or disadvantaged’.

Public organisations can reserve the right to participate in procurement for the award of a public contract / framework to a supported business.

Although there is no contract in place following a procurement exercise, a grant funding agreement arrangement is in place with a locally based Supported Business, Restart Orkney. Restart Orkney supply furniture to people who have moved into permanent accommodation following an application for housing when meeting the criteria for homelessness. Orkney Soap, a subsidiary of Cope Ltd, has been supplying liquid soap for use in Council establishments for several years, unfortunately the Orkney outlet has now closed [August 2018] following a period of uncertainty.

The classification change in 2016 expanded the potential for more businesses to be included in this category however the Council’s contract activity for last year has not provide an opportunity to carry out such an exercise.

Section 5 – Future Regulated Procurements Summary

The Procurement team has worked with Executive Directors across the Council to develop a forward procurement plans for their service areas. These plans identify the Council’s anticipated procurement activity for the coming year for Category C and C1 procurement (excluding Category A and B activity).

The Act has extended this timeframe to two years and Appendix 2 includes information regarding anticipated Regulated Procurements for that period. As referenced in the introduction above, this report includes information on all procurement activity and this is included in the Forward Plan, i.e. it also covers ‘non-regulated’ procurement.

See Appendix 3 for the Council’s Forward Plan.

Section 6 – Other Information

Supplier Development

A Meet the Buyer event has been held annually for the last three years with a fourth event planned for 9 October 2019. The events are organised by the Councils’ Procurement Team together with service colleagues and Business Gateway.

Scotland Excel have presented in person to the last three Meet the Buyer events, similarly the Supplier Development Programme has been active in providing support to contractors and actively involved in helping local firms do business better with the Council. The events have been attended by 40 to 50 individuals on all three occasions and have been well received.

The following commitments have been made as part of the Council’s Procurement Improvement Action Plan:

  • To increase attendance at ‘meet the buyer’ or equivalent events to cover areas of concern, engage with local suppliers and advice on how to become a supplier to the Council. Encourage main contractors to engage with SMEs through the inclusion of Community Benefit clauses.
  • Encourage suppliers to the Council to access support available to businesses, via Business Gateway Orkney and the Supplier Development Programme.

Collaboration and Partnering Opportunities

In accordance with the Council’s Procurement Strategy there is a Council Commitment regarding collaboration and partnering. It is recognised that greater efficiencies can be achieved by improved collaboration between different organisations within the public sector with similar requirements, whether within the local government sector or in other areas of the public sector, such as the Scottish Government, the Crown Commercial Service, Non-Departmental Public Bodies and the National Health Service (NHS).

Collaboration maximises the value of procurement whether it be through aggregation of demand or through the sharing of resources to reduce administration. Framework Agreements are noted as either a Category A Contract or a Category B Contract or Category C1 for local collaborative contracts in place. The Council’s use of these is shown in the tables below.

The Council’s internal contract register lists all purchases for works, services and supplies known to have a contract in place. This register does not include ad hoc purchases for values typically under the £10,000 minimum threshold as noted in the Council’s CSOs. There are exceptions to this rule where the nature or complexity of the contract does warrant a contract in place, for example, IT licensing agreements, cleaning contracts etc.

In total there are 468 live contracts listed in the Council’s contract for the year 1 April 2018 to 31 March 2019.

Tables 1, 2 and 3 below summarises all live contracts as recorded on the Council’s Contract Register by category for the previous three complete financial years and a corresponding split between Services, Supplies and Works.

Table 1 – 1 April 2016 to 31 March 2017

Contract Category Analysis of Contracts (as recorded on the Contracts Register)NumberPercentage of Total ValueEstimated Contract Value (£)
Category A (national)2111.64%2,830,560.07
Category B (sectoral)187.45%1,811,503.54
Category C (local single supplier)16372.64%17,663,409.07
Category C1 (local contract / framework including local collaborative framework agreements). (Example for Category C1 are the collaborative contracts in place with the Council as the lead with NHS Orkney for the provision of food for the schools, residential homes and the Balfour Hospital and specialist legal services working collaboratively and e-learning working.)232.00%486,816.67
Category O (other)1016.26%1,523,172.78
Total326100.00%24,315,462.12
Type of ContractNumber of ContractsPercentage of Total ContractsValue of Contracts (£)Percentage of Total Value
Service24073.62%14,116,677.7658.06%
Supply6519.94%4,814,221.1719.80%
Works216.44%5,384,563.2022.14%
Total326100.00%24,315,462.12100.00%

Table 2 – 1 April 2017 to 31 March 2018

Contract Category AnalysisNumberPercentage of Total ValueEstimated Contract Value (£)
Category A (national)1810.41%3,151,612.07
Category B (sectoral)437.77%2,354,034.99
Category C (local single supplier)18774.85%22,667,547.25
Category C1 (local contract / framework including local collaboration). (Examples for Category C1, are as for 2016 / 2017, the provision of contracts for food, specialist legal services working collaboratively and e-learning working collaboratively with other Public Authorities with the addition of the provision of tax advisory services)261.60%484,316.67
Category O (other)1125.37%1,625,027.23
Total386100.00%30,282,538.21
Type of ContractNumber of ContractsPercentage of Total ContractsValue of Contracts (£)Percentage of Total Value
Service25666.32%15,853,299.0352.35%
Supply8221.24%4,589,907.1215.16%
Works4812.44%9,839,332.0632.49%
Total386100.00%30,282,538.21100.00%

Table 3 – 1 April 2018 to 31 March 2019

Contract Category AnalysisNumberPercentage of Total ValueEstimated Contract Value (£)
Category A (national)1209.29%3,239,609.60
Category B (sectoral)296.76%2,356,310.38
Category C (local single supplier)19075.57%26,339,687.96
Category C1 (local contract / framework including local collaboration). (Examples for Category C1, are as for 2016 / 2017, the provision of contracts for food, specialist legal services working collaboratively and e-learning working collaboratively with other Public Authorities with the addition of the provision of tax advisory services)121.05%364,900.00
Category O (other)1177.33%2,553,243.36
Total468100.00%34,853,751.30
Type of ContractNumber of ContractsPercentage of Total ContractsValue of Contracts (£)Percentage of Total Value
Service24452.14%17,163,049.9549.24%
Supply16234.61%4,896,225.1714.05%
Works6213.25%12,794,476.1836.71%
Total468100.00%34,853,751.30100.00%

Procurement Annual Spend Data

The Council is required by the Scottish Government to input its annual spend data to the Procurement Hub which records all purchasing transactions made by the Council for each financial year. The information is processed and released back to the Council for the purposes of analysis and forward planning.

The following table provides a summary of key data for the Council spend data for the past four financial years.

Financial Year2015 / 20162016 / 20172017 / 20182018 / 2019
Total Spend (£)44,002,01540,922,97343,949,84745,158,580
Core Trade Spend (£)39,228,69236,836,23338,934,32840,890,739
Input suppliers2,2212,2452,2492,129
De-dedicated Suppliers2,1832,2162,2182,091
Duplicate Suppliers38293138
SME Suppliers761733702671
Local Suppliers235225228238
Transactions35,72834,65534,29234,684
Average Spend per supplier (£)20,15618,46719,81521,596
Percentage of SME Spend70%75%63%67%
Percentage of Local Spend48%43%41%47%
Percentage of Core Trade Spend of Total Spend89.15%90.01%88.59%90.55%

Procurement Spend – National Context

The Council has the third highest value (41%) in comparison to the whole of Scotland for the reporting period 2018 to 2019, for total procurement spend on local SMEs (Figure 2).

Orkney’s local procurement spend on local SMEs is 14% above the all Scotland national average of 27% (Figure 1).

Please note that the figures referred to in this section are the percentages of the Council’s spend on local SMEs which is a different data set to the figures recorded for percentage of SME Spend and percentage of Local Spend in the table above.

What percentage of my council’s procurement is spent on local enterprises?

Figure 1: Percentage of Council Procurement spent on local SMEs 2017 to 2018. Source: www.improvementservice.org.uk, accessed 06 September 2019.

IMAGE: Two doughnut charts compare procurement spent on local SMEs: Orkney Islands is 41% and Scotland is 27%.

Figure 2: Percentage of Council Procurement spent on local SMEs – Scottish Local Authorities 2017 to 2018. Source: as above.

IMAGE: A bar chart compares Scottish local authorities by the percentage of procurement spent on local SMEs. Orkney Islands is highlighted at 41%, ranking third highest; the chart’s national comparison ranges from approximately 9% to 54%.

Climate Change Duties

The Climate Change (Scotland) Act 2009 places ‘Climate Change Duties’ (CCD) on public bodies, which require them to:

  • Contribute to national carbon emissions reduction targets.
  • Contribute to climate change adaptation.
  • To do this sustainably.

All public bodies are required to report annually to the Sustainable Scotland Network at the Edinburgh Centre for Carbon Innovation, setting out what they are doing to fulfil their CCD.

The Council is currently preparing its CCD report for 2018 to 2019 which is due to be submitted by November 2019. Copies of previous CCD reports may be accessed at https://sustainablescotlandnetwork.org/reports/orkney-islands-council.

Biodiversity Duty

Part 1 of the Nature Conservation (Scotland) Act 2004 places a ‘Biodiversity Duty’ on public bodies, requiring them to ‘further the conservation of biodiversity’ when carrying out their functions. Local authorities are well placed to deliver biodiversity conservation; as land managers and planning authorities they can have a significant positive impact on biodiversity protection, as well as identifying opportunities for enhancement.

Across a range of functions there are also opportunities for education, community engagement, sustainable resource management, projects and initiatives which can deliver significant benefits for biodiversity.

The Wildlife and Natural Environment (Scotland) Act 2011 requires public bodies in Scotland to provide a publicly available report, every three years, describing the actions which they have taken to meet their Biodiversity Duty. Biodiversity Duty Reports prepared by the Council are available on the Council’s website at https://www.orkney.gov.uk/.

The Council is a member of the Orkney Local Biodiversity Action Plan Steering Group and helps prepare and implement the Orkney Local Biodiversity Action Plan (LBAP). First published in 2002 then revised in 2008, 2013 and 2018, the LBAP identifies actions which can be taken locally, and which will contribute to the conservation of those species and habitats identified as being ‘at risk’ or ‘threatened’ in the UK. All four versions of the LBAP are accessible from the Council’s website at https://www.orkney.gov.uk/.

Appendix 1

Summary of Regulated Procurement carried out 1 April 2018 to 31 March 2019

Date of AwardSupplier NameSubject MatterEstimated Value (£)Start DateEnd Date
25/09/2018Enable ScotlandPersonalised Care and Support Services in Orkney for One Individual with Complex Needs.134,813.2025/09/201824/09/2022
18/09/2018YpeopleYoung Persons Accommodation Based Housing Support.956,859.2001/10/201830/09/2023
10/04/2018Aquatera Ltd.Provision of a Bird Study.92,286.0010/04/201809/04/2020
31/05/2018Bill Mackie Engineering Ltd.2018 – Vessel Re-Fit MT Einar.80,046.5011/06/201829/06/2018
02/06/2018Dales Marine Services Ltd.2018 – Vessel Re-Fit MT Erlend.68,095.4002/07/201822/07/2018
18/06/2018Norscot Truck & Van Ltd.1 No. 12T Lorry with Hooklift.95,330.0022/10/2018Purchase Only
28/06/2018Specialist Computer Centres PLC.Supply and Delivery of Network Hardware.66,144.7509/08/2018Purchase Only
04/07/2018Linlathen Neurological Care Centre.Care Home Placement – Neuro Specific – Out of Orkney Placement.194,928.0011/04/201810/04/2020
24/08/2018Nu-Track Ltd.15 Seat Disabled Access Mini Bus x 2.160,400.0002/11/2018Purchase Only
30/05/2018Harmeny Education TrustIndividual Placement Agreement.123,552.2730/05/201829/05/2019
25/03/2018Seven Health CareAgency Support Workers.144,079.1001/04/201801/06/2019
16/07/2018Transas Marine Ltd.VHF Upgrade – Orkney VTS – GB.115,000.0006/10/2018Purchase Only
31/08/2018Marwood Electrical Company Ltd.Supply and Delivery of LED Lanterns.168,671.0003/09/2018Purchase Only
12/10/2018Siemens Mobility Ltd.Electronic Vehicle Charger Points.141,956.0012/10/201831/03/2019
05/03/2019Aquatera Ltd.Consultancy Services – Virtual Dive and Underwater Interpretation.60,000.0011/03/201931/03/2020
22/02/2019Aquatera Ltd.Natural Heritage Guides and Interpretation Boards.80,000.0026/02/201907/06/2020
30/11/2018Crantit DairySupply and Delivery – Fresh Milk.244,000.0001/12/201830/11/2022
30/11/2018Orkney Fishermen’s Society Ltd.Supply and Delivery – Fresh Fish.100,000.0001/12/201830/11/2022
30/11/2018J & W GraysSupply and Delivery – Diary Products.540,000.0001/12/201830/11/2022
10/12/2018Finlay Scotland Ltd.Terex / Finlay Rinsing 683 Tracked Rinsing Screen x 1.142,600.0010/12/2018Purchase Only
21/12/2018Bill Mackie Engineering Ltd.2019 Re-Fit – MV Earl Sigurd.65,934.5007/01/201923/01/2019
22/01/2019Bill Mackie Engineering Ltd.2019 Re-Fit – MV Earl Thorfinn.92,372.5028/01/201911/02/2019
14/12/2018Scot JCB Ltd.Telehandler x 1.450,000.0015/12/2018Purchase Only
25/01/2019A M Phillip Trucktech Ltd.Pickups x 3.458,225.0026/01/2019Purchase Only
29/11/2018Fisher Associates Ltd.Outline Business Case for Orkney Harbours.97,000.0003/12/201801/08/2019
25/01/2019Argo’s BakerySupply and Delivery – Bread and Morning Goods.280,000.0001/02/201931/01/2023
30/01/2019James Wilson (Orkney) Ltd.Supply and Delivery – Frozen Foods.480,000.0001/02/201931/01/2023
28/02/2019J W GraySupply and Delivery – Fresh Fruit, Vegetables and Potatoes.480,000.0001/03/201928/02/2023
13/02/2019Ship2Shore OrkneyCruise Ship Welcome and Information Service.339,848.0001/03/201928/02/2023
31/01/2019MacGregorStromness Walkway Repairs.69,082.0002/02/201909/02/2019
31/01/2019Skip Units Ltd.Skips x 14.52,050.0001/02/2019Purchase Only
11/02/2019Bill Mackie Engineering Ltd.2019 – Refit MV Varagen.70,434.5018/02/201908/03/2019
10/07/2018Auxiliar Navel Del Principado, S. A.Supply of One New Pilot Boat (Design and Build).1,849,800.0020/07/201831/08/2019
01/02/2019Sanmar Denizcilik Makina ve Ticaret A. S.Supply of Two New Towage Boats (Design and Build).12,200,000.0011/02/201911/08/2021
31/01/2019Andrew Sinclair Ltd.Earth Moving Services.50,746.2001/02/201916/03/2019
15/03/2019Bill Mackie Engineering Ltd.2019 – Refit Hoyhead.72,186.0020/03/201903/04/2019
21/12/2018A Sinclair Ltd.Arcadia Park.226,730.1401/03/201931/03/2019
23/11/2018HRI Munro Architectural Services Ltd.Architectural Consultancy.172,465.0001/01/201931/12/2021
18/01/2019ATB Drilling Ltd.Smiddybrae Boreholes.171,073.0020/03/201910/05/2019
05/06/2018RS RendallStronsay Cemetery.204,405.2005/06/201828/02/2019
28/11/2018RS RendallHolm and South Ronaldsay Cemeteries.247,916.7828/11/201831/10/2019
06/07/2018Orkney Builders Ltd.Phase 2 Thermal Upgrade – Stromness Academy.436,082.5110/09/201810/05/2019
20/12/2018BDSDemolition of Former Shellfish Factory (H29).114,290.0027/02/201812/09/2018
01/06/2018R S MerrimansEmergency Lighting and Fire Alarm Servicing.81,566.0001/06/201831/05/2021
30/04/2018A SutherlandExternal Paintwork Contract 1 – 2018.40,550.0003/05/201801/11/2018
26/07/2018A SutherlandExternal Paintwork Contract 2 – 2018.40,550.0026/07/201825/02/2019
09/01/2019WRC ConstructionWindow and Door Replacement – Council Houses 2018.130,854.9009/03/201909/03/2022
11/07/2018Price Roofing Ltd.Re-Cladding G7 Garson Industrial Estate, Stromness.153,461.4713/08/201805/10/2018
07/06/2018Casey Construction Ltd.Re-Roofing Works at Harbour Store, Kirkwall.65,233.9527/08/201819/11/2018
31/05/2018R CloustonCladding Repair at Ness Battery, Stromness.51,492.0831/07/201830/09/2018

Appendix 2

Procurement Service Improvement Action Plan 2018 to 2019

1. Sustainability

The Council is conscious that its procurement decisions must take account of the social, economic and environmental impact it has on the people and communities of Orkney and elsewhere.

BRAG indicators:

  • Blue – Complete.
  • Amber – At risk of not delivering to the timescale.
  • Red – Overdue or will be late.
  • Green – On track.
Council commitmentActionProgress to dateCompletion dateBRAG
1.1. To embed sustainability into the procurement process where it is relevant to the subject matter of the contract and to comply with the Council’s Sustainability Duty.Consideration of sustainability built into individual commodity strategy as evidence.Development of a commodity strategy for each individual procurement as included in the reviewed CSOs approved in June 2016. Complete in Central Procurement Unit (CPU), roll out to other services in progress, where appropriate.March 2018.Blue.
1.2. Implementation of the Scottish Government 10 steps to Sustainable Procurement to assist sustainability and other responsible procurement themes.Sustainable Procurement Policy 2013 to 2015 in place. Part of the new suite of legislation effective from June 2016. Ensure all proforma documentation is updated accordingly.Sustainability clause in all Invitation to Quote and Invitation to Tender documentation issued by the CPU. Incorporated into all documentation when appropriate.March 2018.Blue.
1.3. To engage with the local supplier base to develop Community Benefit Clauses to maximise the potential of the local economy to compete for Council business for the economic benefit and sustainability of Orkney.Consultation event planned for spring / summer 2017 re Sustainable Procurement Policy update 2017 to 2018.Consultation complete and final Strategy published March 2018.September 2018.Blue.
1.4. To implement the use of Community Benefit Clauses in contracts as appropriate.Update CSOs and procurement proformas for the Commodity strategy and the contract award recommendation report updated to ensure compliance with the new requirement to consider the inclusion of a community benefit clause for all procurement with a value over £4 million.CSOs revised and updated 2018, proformas being updated accordingly.March 2018.Blue.
1.4. To implement the use of Community Benefit Clauses in contracts as appropriate.Sustainability training to be developed for network of procurement officers with delegated authority.Sustainability training to be developed for network of procurement officers with delegated authority.December 2019.Green.
Indicator – 1. Sustainability2016 to 20172017 to 20182018 to 20192019 to 20202020 to 2021
Percentage of relevant Procurements where Community Benefit Clauses have been included in the award criteria.5% (100%).10% (100%).N / A.N / A.N / A.
Number of Procurements where Community Benefit Clauses have been included in the award criteria.3.4.6 (5).8.10.
Percentage of overall spend with the third sector and supported businesses.7% (5.52%).8% (10.65%).11% (11.91%).12%.13%.
Percentage of contract spend with local supplier base in Orkney.50% (43%).52% (41%).55% (47%).56%.57%.

2. Working with suppliers

The Council recognises that there is a popular view amongst suppliers and contractors, and particularly amongst SMEs, that Councils are difficult to do business with and that communications are often poor.

Council commitmentActionProgress to dateCompletion dateBRAG
2.1. At all times adopt a professional approach in all of its business undertakings with suppliers and contractors. Where decisions are made every effort will be made, within the confines of the law and commercial confidentiality, to provide a full explanation of the reasoning behind the procurement decision making process.Recording of evaluation decisions integrated to procurement process.Feedback provided as required by law and within the 15-day mandatory timescale. European Social Fund / Scottish Government audit report recommendation to keep all individual evaluations on record incorporated into the procurement manual update.June 2017.Blue.
2.2. To ensure that the procurement process is appropriate to the value and complexity of the goods, services and works that are being acquired and to keep bidding costs to the minimum necessary and remove barriers to participation by, for example small firms, the self-employed and the third sector without discriminating against others.Documentation prepared that is proportionate to the value and complexity of the procurement. How to Tender workshops run by Business Gateway on a regular basis.Documentation and method of advertising considered as per CSOs in a proportionate and accessible manner, utilising QQ wherever possible and contacting suppliers prior to release of advert or QQ.April 2019 Complete. Now incorporated as Business as Usual.Blue.
2.3. To review contract award procedure – to ensure that they place the minimum possible burden on suppliers.Reviewed on an ongoing basis.Standard method statements in place for low value procurements and evaluation of submissions. Minimal documentation in place.April 2019 Complete, now incorporated into Business as Usual.Blue.
2.4. Use outcome based tender specifications wherever possible – to allow businesses to propose innovative and alternative solutions to the Council’s needs.Method statements adopted.Consider outcome-based specification training for delegated authority officers.March 2019.Red.
Indicator – 2. Working with suppliers2016 to 20172017 to 20182018 to 20192019 to 20202020 to 2021
Percentage of local supply base registered with the Supplier Development Programme.8% (No systems in place to record this data).12% (No systems in place to record this data).N / A.N / A.N / A.
Number of local suppliers registered with the Supplier Development Programme.N / A.36.40 (36).45.50.
Number of local supply base registered on the PCS Advertising Portal.N / A.N / A.89 (83).95.100.
Percentage of outcome based specifications in place.2% (No systems in place to record this data).5% (No systems in place to record this data).N / A.N / A.N / A.
Percentage of Council spend attributed to SMEs.50% (75%).52% (63%).65% (67%).66%.67%.
Number of Local Suppliers (Local suppliers providing goods, services or works to the Council).250 (225).265 (228).230 (238).235.240.

3. Value for money

Section 1, Local Government in Scotland Act 2003 places a statutory duty on the Council to secure best value. Procurement activities which deliver value for money will contribute to the achievement of value for money.

Best Value is continuous improvement in the performance of the Council’s functions. In accordance with Best Value principles all proposed and current services arrangements shall be subject to review and option appraisal.

The aim of Council procurement must be the achievement of value for money (the optimum combination of whole life cost and quality) for the Council.

Council commitmentActionProgress to dateCompletion dateBRAG
3.1. To further develop tender evaluation procedures in order that contracts awarded represent value for money (or Most Economically Advantageous Tender where the full provisions of the Procurement Regulations apply) taking quality and price into consideration and not just lowest price.Procurement advice and CSOs.New Regulations June 2016 mandate regulated procurement and over to utilise Most Economically Advantageous Tender (MEAT) in all tender – CSOs reviewed in June 2016 include this requirement. Procurement Manual updated to include this.June 2017.Blue.
3.2. As part of value for money considerations the Council will take account of other relevant Council policies in relation to corporate social responsibility, sustainability and Community Benefits.Sustainable Procurement Policy.Example clause and link referring to Sustainable Procurement Policy included in all Invitation to Quote (ITQ) and Invitation to Tender (ITT) documentation issued by the CPU. Procurement Bulletin distributed to Officers with Delegated Procurement featured new Sustainable Procurement Policy.December 2017.Blue.
3.3. To raise awareness internally of potential framework savings and make recommendations to ensure a more consistent approach across all Council services.Awareness training and improve visibility of available framework agreements to service areas.Awareness training provided to Corporate Admin Group. Contract information on the staff portal reviewed and updated.March 2018.Blue.
Indicator – 3. Value for money2016 to 20172017 to 20182018 to 20192019 to 20202020 to 2021
Percentage savings target secured through increase on-contract spend.1% (No systems in place to record this data).2.5% (No systems in place to record this data).N / A.N / A.N / A.
Percentage of procurement spend covered by a contract.55% (66%).60% (78%).80% (77%).85%.88%.
Savings targets for frequently purchased items.£50,000 (systems under development to record this).£103,000 (systems under development to record this).£97,000 (systems under development to record this).TBC.TBC.

4. Collaboration and partnering

Greater efficiencies can be achieved by improved collaboration between different organisations within the public sector with similar requirements, whether within the local government sector or in other areas of the public sector, such as the Scottish Government, the Crown Commercial Service, Non-Departmental Public Bodies and the NHS. Collaboration maximise the value of procurement whether it be through aggregation of demand or through the sharing of resources to reduce administration.

Council commitmentActionProgress to dateCompletion dateBRAG
4.1. Where collaborative arrangements provide a benefit to the Council there will be a strong presumption towards the use of contracts that have been established by Procurement Scotland (the national centre of procurement expertise) and Scotland Excel (the local government centre of procurement expertise).Increase the use of framework agreements.Use of frameworks the default position where no local market identified. Category C contracts only put in place where no local market or framework available that demonstrates best value. New CSOs include section for framework agreements.June 2016.Blue.
4.2. Where it is demonstrated that collaborative contracts represent value for money to the Council the use of such contracts should be mandatory across the Council to reduce off-contract buying.Ensure all service areas are aware of collaborative contracts available and arrangement for purchasing goods and services.Change programme review in progress to identify where use of framework agreements could be maximised. Now Business as Usual.March 2018.Blue.
4.3. Where there is a known local supply base as well as collaborative contracts available for the Council to use, a twin track approach should be used to ensure best value is achieved and the local market has the opportunity to respond to contract opportunities.All procurement exercises considered on this basis on a case by case basis. Procurement Manual to incorporate this approach.Procurement Manual updated to incorporate this where contracting opportunity is below the threshold for regulated procurements.April 2019.Blue.
4.4. To collaborate wherever possible with the various Centres of Expertise and Procurement Expertise to maximise the value of strategic procurement.Links with Scotland Excel strengthened and regular commercial User Intelligence Group held with area representative.Increase in use of framework agreements and an increase in the range of framework providers utilised.April 2019. Now Business as Usual.Blue.
Indicator – 4. Collaboration and partnering2016 to 20172017 to 20182018 to 20192019 to 20202020 to 2021
Percentages of contract spend utilising Collaborative Contracts.15% (21.09%).20% (19.78%).22%.23%.25%.
Percentage of locally based contractors participating in Collaborative / Framework Contract Opportunities.0% (0%).1% (0%).1% (0%).1%.1%.
Percentage of contract opportunities where local supply base have had the opportunity to submit bids.N / A.N / A.10% (systems under development to record this data).15%.20%.
Percentage of contract spend with local supplier base in Orkney.50% (43%).52% (41%).50% (47%).50%.50%.

5. Governance

The Council currently has a highly devolved procurement structure with the majority of services still carrying out a sizeable procurement role. The culture of compliance with the Councils governance arrangements is difficult to manage. The Council expects that all possible attention is given to the issue of accountability and governance in the area of procurement.

Council commitmentActionProgress to dateCompletion dateBRAG
5.1. The Council’s Procurement Member Officer Working Group (PMOWG) will consider the strategic direction of Procurement.PMOWG re-established and terms of reference reviewed.PMOWG Terms of Reference agreed. PMOWG meets as needed throughout the year and has been amended to be a Consultative Group.April 2019. Now Business as Usual.Blue.
5.2. The Council will introduce an embedded procurement officer network (a network of staff who are formally authorised to undertake procurement activities on behalf of the Council).A network of lead procurement officers across service areas has been established. Delegated authority forms and guidance reviewed in consultation with Heads of Service.Delegated authority forms reviewed and completed by relevant Directors.April 2019. Now Business as Usual.Blue.
5.3. Suppliers will be given notice that goods, services and works should only be provided to the Council on the award of a contract or purchase order.Confirm the position with colleagues in Finance.This will be instigated when Purchase to Pay (P2P) has been established.March 2020.Green.
5.4. That no member of Council staff may award a contract or purchase order without written delegated authority.CSOs and financial standing orders reviewed in 2014. (Reviewed again in 2016).Register of Officers with delegated approval for procurement and purchase orders in place.April 2019.Blue.
5.5. The key roles of budget holder and procurer will not be performed by the same member of staff.CSOs reviewed.Highlighted to relevant service areas via discussions with key Managers. Procurement Manual and CSOs reviewed.April 2019.Blue.
5.6. The Council will endeavour to ensure there are no potential conflicts of interest in the procurement process.Officers with delegated authority to carry out procurement to be made aware of the requirement to declare any potential conflict of interest.Proforma form developed and in use by staff who are involved in the evaluation of tenders.July 2017.Blue.
5.7. The Council will endeavour to comply with the Scottish Procurement Policy Handbook. https://www.gov.scot/publications/public-procurement-reform-programme-scottish-procurement-policy-handbook/pages/0/Scottish Government Routes 1, 2 and 3 are integral to the CSOs and the Procurement Manual.CSOs and Procurement Manual are reviewed regularly (latest review carried out and completed in March 2018 for the CSOs and in April 2019 for the Procurement Manual). Future reviews scheduled for 2020, or when there are legislative changes.CSOs July 2018. Procurement Manual April 2019.Blue.
5.8. The Council will comply with the CSOs. https://www.orkney.gov.uk/Council/C/Contract-Standing-Orders.htmCSOs updated to reflect new legislation. iLearn Procurement Awareness iLearn module developed.Updated CSOs available on the Council Website and Staff Portal. iLearn training module under development.July 2017. December 2019.Blue. Green.

6. Contract Management

Active contract management is increasing across the Council with segmentation used to identify high value / high risk contracts to ensure targeting of staff resources to develop and apply a contract management plan at the implementation stage following contract award.

Council commitmentActionProgress to dateCompletion dateBRAG
6.1. To strengthen contract management procedures by holding regular meetings with major contractors to review performance and improve levels of contract compliance.Contract management clause written into all relevant ITTs documentation.Contract manager and administrator roles in place for Schools Investment Programme and high value / high risk projects.March 2018.Blue.
6.2. To roll out contract management arrangements to all high value high risk contractors.Contract management clause written into all relevant ITTs. Segmentation approach to be embedded in proforma documentation as appropriate.Service areas responsible for contract management for works and part of the Joint Contracts Tribunal (JCT) / New Engineering Contracts (NEC). Services operate effective contract management in consultation with CPU. Formal contract management proforma to be developed for service contracts. Documentation to be updated to reflect segmentation and identification of high risk / high cost projects as appropriate.March 2018. December 2018.Blue. Red.
6.3. Exit strategy to be considered and documented for all contracts where appropriate.Exit strategy to be considered as an integral part of contract management.Procurement manual to be updated to reflect the importance of exit strategies in contract management processes where appropriate to the subject matter of the contract.April 2019.Blue.
Indicator – 6. Contract management2016 to 20172017 to 20182018 to 20192019 to 20202020 to 2021
Percentage of contracts Classified as high value / high risk with an appropriate contract management plan in place.25% (26.99%).30% (53.85%).60% (52.5%).65%.70%.
Percentage of contracts with an exit plan in place where appropriate.N / A.N / A.60% (No systems in place to record this data).65%.70%.
Percentage value of savings negotiated during the annualised contract period where there is a contract in place.1% (no data currently available).2% (no data currently available).N / A.N / A.N / A.
Percentage of contracts where improvements have been agreed and implemented.1% (no data currently available).2% (no data currently available).N / A.N / A.N / A.

7. Communication

It is recognised that, key to the successful implementation of any new procurement processes or policy, there has to be an understanding amongst all stakeholders of the reasons behind such actions.

Council commitmentActionProgress to dateCompletion dateBRAG
7.1. To inform and advise its stakeholders by means of: Increasing the use of the PCS website at http://www.publiccontractsscotland.gov.uk/.Promote the use of the PCS portal.Significant increase in usage of PCS – Paper copies of tenders are now available on an exception basis only.March 2020.Green.
7.2. Increasing the use of the procurement page on the Council’s intranet (portal).Increase awareness amongst council staff via bulletins and briefing notes to Senior Management Team (SMT) / Corporate Management Team (CMT).Awareness raising ongoing amongst CPU staff and the network of procurement officers with delegated authority to carry out procurement is ongoing.March 2018.Blue.
7.3. Increasing the use of the procurement section of the Council’s website.Website information regularly updated.Awareness raising via How to Tender workshops and Meet the Buyer Event. Contracts register link on website and promoted via news item on the Council website.August 2016. Now business as usual.Blue.
7.4. Increase attendance at ‘meet the buyer’ or equivalent events to cover areas of concern, engage with local suppliers and advice on how to become a supplier to the Council. Encourage main contractors to engage with SMEs through the inclusion of Community Benefit clauses.Organise a Council wide Meet the Buyer event and consider joining the Supplier Development Programme. Requirement for Inclusion of Community Benefit clause now mandatory for all contracts with a value of over £4m.Meet the Buyer events took place in August 2016, October 2017 and October 2018. Membership of the Supplier Development Programme. Continuing membership under review. Fourth Meet the Buyer Event planned for 9 October 2019.August 2016. Now business as usual.Blue.
7.5. Encourage suppliers to the Council to access support available to business, via Business Gateway Orkney and the Supplier Development Programme.Construction was one of the main focus areas for the Meet the Buyer Event (MTBE) on 25 August 2016.MTBE 2018 October event planning commencing May 2018, a different focus planned for each next event, possibly Transport to be confirmed.October 2018.Blue.

8. E-Procurement

The Council has yet to implement a process for the replacement of all paper-based purchase ordering systems with a modern e-Procurement system and where appropriate with corporate purchasing cards.

Council commitmentActionProgress to dateCompletion dateBRAG
8.1. To implement an e-Procurement system by December 2017.PCS portal is used for all tender opportunities with a value of over £50,000 for goods and services and works providing an effective and secure e-procurement system.PCS portal use is mandated across the Council. Contract award reminders sent out monthly to all service areas.January 2018.Blue.
8.2. To consider (as appropriate) use of e-procurement tools (e.g. e-tendering and e-European Standard Procurement Document (ESPD) (i.e. PCS-Tender)).Training of staff needed prior to authorised usage of PCS-Tender.Training has been completed for PCS-Tender which took place in January 2018. Electronic-ESPD now available for PCS which is in use by a number of Procurement Officers.December 2017.Blue.
8.3. To maximise the use of the PCS ‘QQ’ facility for low value / low risk procurements.Briefing note distributed to all staff. Alternative methods of information dissemination iLearn modules under consideration.QQ usage significantly increased – paper tenders only used on an exceptional basis only. iLearn module under development.March 2018. December 2019.Blue. Green.
Indicator – 8. E-Procurement2016 to 20172017 to 20182018 to 20192019 to 20202020 to 2021
Percentage of invoices paid within 30 days.80%.90%.TBC.TBC.TBC.
Percentage of invoices using e-procurement / purchase to pay system.4% (Systems not in place yet).25% (Systems not in place yet).60% (Systems not in place yet).TBC.TBC.
Percentage of procurement undertaken using e-tendering system i.e. PCS-Tender or ESPD Module.N / A.N / A.10% (12% - applicable contracts 76%).50%.100%.

9. Monitoring and measurement

Performance measurement within the Council has developed significantly in recent years. In order to measure improvement in effectiveness and efficiency it is important that an agreed set of standard indicators are adopted. The methods of monitoring and measuring procurement performance are required to be proportionate to the scale and complexity of the Council’s procurement activities.

Council commitmentActionProgress to dateCompletion dateBRAG
9.1. The Council will implement as standard, the Best Practice Indicators (BPIs) that were recommended by the Public Procurement Reform Board as a means of measuring the effectiveness and efficiency of the procurement function.BPIs uploaded to the procurement hub.Key Performance Indicators (KPIs) reported on via corporate performance reporting system. Not all BPIs reported on directly, Performance Capability Assessment / PCIP pick up these in an alternative format.July 2017. Business as usual.Blue.
9.2. The PCIP performance reporting framework to be considered for incorporation and adoption of additional BPIs as appropriate.Participation in the PCIP planned for July 2017.Outcomes and recommendations from 2017 assessment incorporated into Procurement Improvement Plan.March 2018.Blue.

10. Guidance

An important aspect of the role of the procurement function is to provide guidance and advice to both Council services and to all stakeholders.

Council commitmentActionProgress to dateCompletion dateBRAG
10.1. The Council will continue to develop procedural guidance as follows: The introduction of standard procurement guidance.Update procurement manual in line with 2016 legislation and to incorporate new Strategic commitments.Procurement Manual updated.July 2018.Blue.
10.2. Provide training in the use of standard procurement guidance.Training to be developed and accessible for existing and new staff members.Training accessed via Scottish Government and disseminated to new staff prior to taking up delegated procurement officer duties. Basic operational training under development for roll out as an iLearn module.December 2019.Green.
10.3. To develop a purchasing guide for those involved in the ordering of supplies and services.Procurement manual in place.Procurement manual under reviewed to match updated CSOs. Liaise with finance / review of relevant procurement sections. Purchase to pay procedures to be developed in conjunction with the Integra Project Team.July 2018. March 2020.Blue. Green.
10.4. To review and publish standard selection questionnaire (ESPD), tender documentation and standard letters.Standard documentation developed and in place.ESPD (which replaces the Pre-Qualification Questionnaire). Standard documentation is in place for supplies and services. JCT and NEC contracts utilised for engineering and works contracts. New CSOs provide for the adoption of the ESPD and use of Routes 1, 2 and 3 of the procurement journey ensuring that the most up to date documentation is used.Electronic ESPD now business as usual.Blue.
10.5. One suite of terms and conditions for all Council Requirements.Standard terms and conditions under review.Reviewed terms and conditions published on staff portal and Council website by end of 2017. New General Data Protection Regulations legislation incorporated and published on the Council’s website.May 2018.Blue.

11. Training

The Council recognises that training and development are essential to an effective procurement function and that this is a key element of the McClelland Review and the ongoing Procurement Capability Assessments.

Council commitmentActionProgress to dateCompletion dateBRAG
11.1. Develop training to ensure that procurement activities are compliant with legislation and obtaining value for money.Training materials to be developed or accessed via Scottish Government or Scotland Excel training courses.Training to ensure a wide range of officers both operational and at a strategic level were aware of the implications of the new legislation was undertaken in March 2016. Suite of iLearn training modules under development.December 2019.Green.
11.2. Develop a training plan to meet the training needs of the Network of Procurement Officers with Delegated Authority to carry out procurement activities. Ensure that Procurement Officers with Delegated Authority receive training in relevant legislation when changes take place.Procurement awareness iLearn and fraud awareness under development. Resources for sustainable procurement and contract management iLearn modules or similar to be identified.Draft training plan to include a suite of iLearn modules under development to include, procurement awareness, contract management, sustainable procurement and procurement fraud awareness. Consideration of potential e-learning modules in progress. Still under development.September 2018 for initial two modules. December 2019 for full suite of iLearn modules.Red.
11.3. To maintain a lessons learned log to ensure that organisational learning is captured and available for continuous improvement.Distribute lessons learned log to network of Procurement Officers with delegated authority and share materials from training events attended by senior officers where relevant.Lessons learned log updated on a regular basis, located on the staff portal and referred to in a briefing note to SMT / CMT.November 2017. Business as usual.Blue.

Appendix 3

Forward Plan for Regulated and Unregulated Procurements April 2019 to March 2021

Subject matter of ContractNew / Extended / Re-letExpected Contract Notice / Publication DateExpected Award DateExpected Start DateEstimated Value of the Contract (£)Regulated / Unregulated
Personalised Care and Support Services in Orkney for Individuals with Complex Needs (Framework).Re-let.August / September 2020.October / November 2020.March 2021.£4,000,000 (over the lifetime of the framework).Regulated.
Cleaning Services (Waiting Rooms and Public Conveniences various mainland and island locations).Re-let.Various 2019 to 2021.Various throughout 2019 to 2021.Various throughout 2019 to 2021.TBA.Unregulated.
Provision of Mobile Phone Services.Re-let.December 2019.March 2020.June 2020.TBA.Regulated.
Personalised Care and Support Services in Orkney for Individuals with Complex Needs (Framework Agreement Call Offs).New and re-let.Various 2019 to 2021.Various throughout 2019 to 2021.Various throughout 2019 to 2021.£4,000,000 (over the lifetime of the framework).Regulated.
Vehicles and Plant replacement.New.Various throughout 2019, 2020 and 2021.TBA.TBA.£1,200,000 per financial year.Regulated / Unregulated.
Vessel Re-fits 2019 individual contracts.Re-let.Various throughout 2019 and 2020.TBA.TBA.TBA.Regulated.
Vessel Re-fit and Strategic Repair Framework 2019 to 2023.New and re-let.Various throughout 2019 to 2023.Various throughout 2019 to 2023.Various throughout 2019 to 2023.£7,800,000 (over the lifetime of the framework).Regulated.
Home Energy Efficiency Programmes for Scotland: Area Based Scheme.Re-let.November 2019.March 2020.June 2020.£500,000 (5-year contract).Regulated.
Turret Clock Keeper Services.Re-let.December 2020.February 2021.April 2021.£3,000 (3-year contract).Unregulated.
Cruise Liner Shuttle Bus Services.Re-let.September 2019.December 2019 – January 2020.March 2020.£700,000 (4-year contract).Regulated.
Aquatic Sample Processing and Taxonomic Determination.Re-let.January 2020.March 2020.May 2020.£60,000 (4-year contract).Regulated.
Security Services For Orkney Harbour Authority.Re-let.March 2020.May 2020.September 2020.£80,000 (4-year contract).Regulated.
Servicing and Leasing of Student Accommodation in Kirkwall.Re-let.April 2020.June 2020.August 2020.£20,000 (4-year contract).Unregulated.
Provision of Air Services.Re-let.September 2020.January 2021.April 2021.£4,000,000 (4-year contract).Regulated.
Outdoor Activity Instructors.Re-let.October 2020.January 2021.May 2021.£88,000 (3-year contract).Regulated.
Accommodation Based Step Down Services.Re-let.December 2019.February 2020.April 2020.£42,000 (2-year contract).Unregulated.
Provision of School Teacher Transport – Eday.Re-let.August 2019.September 2019.September 2019.£900 (2-year contract).Unregulated.
Provision of School Teacher Transport – Stronsay.Re-let.August 2020.October 2020.December 2020.£12,000 (2-year contract).Unregulated.
Provision of School Teacher Transport – Sanday.Re-let.August 2020.October 2020.December 2020.£16,000 (2-year contract).Unregulated.
Provision of School Teacher Transport – Rousay.Re-let.October 2020.November 2020.January 2021.£21,900 (2-year contract).Unregulated.
Paper and Stationery Supply.New.2019 / 2020.TBA.TBA.TBA.Regulated.
Various IT Contracts.New and Re-let.Various 2019 and 2021.TBA.TBA.TBA.Regulated / Unregulated.
Banking Services.Re-let.Autumn 2020.Spring 2021.April 2021.£72,000 (4-year contract).Regulated.
Inspection and Testing of Vehicles for use as Taxi and Private Hire Cars.Re-let.Spring 2021.Summer 2021.Summer 2021.£20,000 (5-year contract).Unregulated.
Boiler and Controls replacement Stromness Swimming Pool.New.Autumn 2019.Winter 2019 / 2020.Spring 2020.£161,000.Unregulated.
External Wall Insulation to Hope Primary.New.Spring 2020.Summer 2020.Summer 2020.£402,000.Unregulated
Soulisquoy Infrastructure.New.Spring 2020.Summer 2020.Summer 2020.£3,000,000.Regulated.
Kirkwall Care Home.New.Winter 2019 / 2020.Spring 2020.Summer 2020.£11,300,000.Regulated.
Demolition of the Former Papdale Halls of Residence.New.Summer 2020.Summer 2020.Autumn 2020.£2,000,000.Regulated.
Various Bus Contracts.Re-let.Summer 2019.December 2019.January 2020.£13,000,000 (5-year contract).Regulated.
Smiddybrae – Ground Source Heat Pump.New.Spring 2019.Summer 2019.Autumn 2019.£459,000.Unregulated.
Barrier No. 1 – Resurfacing.New.2019.2019.2019.TBA.Regulated / Unregulated.
Orkney Library and Archive – Insulation.New.Spring 2019.Summer 2019.Summer 2019.£131,000.Unregulated.
Orkney Library – lighting.New.TBA.TBA.TBA.£108,000.Unregulated.
Fixed Telephony.New / Re-let.2019 / 2020.TBA.TBA.TBA.Regulated.
Kirkwall Pier Deck Slabs.New.2019.Autumn 2019.Autumn 2019.£200,000.Unregulated.
EV Charging.New.2019.Autumn 2019.Autumn 2019.£150,000.Regulated.
Eday Water Main Diversion.New.2019.Autumn 2019.Autumn 2019.£30,000.Unregulated.
Football Pitches Maintenance.Re-let.Autumn 2020.Autumn 2020.Spring 2021.£1,150,000 (5-year contract).Regulated.
Grounds Maintenance Contract.Re-let.Autumn 2020.Autumn 2020.Spring 2021.£64,000 (5-year contract).Regulated.
Stromness Academy – External Wall Insulation – Phase 3.New.Summer 2020.TBA.TBA.£315,000.Regulated.
Dounby Nursery.New.Autumn 2019.Autumn 2019.Winter 2019 / 2020.TBA.Regulated / Unregulated.
Papdale Nursery.New.Winter 2019 / 2020.Winter 2019 / 2020.Spring 2020.TBA.Regulated / Unregulated.
Glaitness Nursery.New.Winter 2019 / 2020.Winter / Spring 2019 / 2020.Spring 2020.TBA.Regulated / Unregulated.
Garden House.New.Winter 2019 / 2020.Winter 2019 / 2020.Spring 2020.TBA.Regulated / Unregulated.
St Andrews Primary School Extension.New.Autumn 2019.Winter 2019 / 2020.Winter 2019 / 2020.TBA.Regulated / Unregulated.
4th Barrier toilet rebuild.New.Autumn 2019.Winter 2019 / 2020.Winter 2019 / 2020.TBA.Regulated / Unregulated.
St Olafs Cemetery Extension.New.Spring 2020.Spring 2020.Summer 2020.TBA.Regulated / Unregulated.

Anticipated Long Term Capital Projects

Subject matter of ContractNew / Extended / Re-letExpected Contract Notice / Publication DateExpected Award DateExpected Start DateEstimated Value of the Contract (£)Regulated / Unregulated
Orkney Integrated Waste Management facility.New.TBA.TBA.TBA.TBA.Regulated.
Renewables Project (Scale Wind) various.New.TBA.TBA.TBA.TBA.Regulated.
Private Wire Project various.New.TBA.TBA.TBA.TBA.Regulated.
Port Master Plan Various.New.TBA.TBA.TBA.TBA.Regulated / Unregulated.