Skip to main content

The content below has been generated by an AI model. If anything is unclear, check the source document (opens in new tab) .

Development Brief

Land North of Muddisdale Road, Kirkwall K4

February 2024

IMAGE: Aerial view of the land north of Muddisdale Road, Kirkwall, with the development site outlined in red. The site contains agricultural fields and blocks of trees, and is adjacent to Kirkwall Golf Course, housing, sports facilities and woodland. The cover also displays the Orkney Islands Council and Orkney Islands Council Development and Marine Planning logos.

Contents

  1. Introduction

  2. Site context

  3. Vision and strategy

  4. Development principles

  5. Delivery and monitoring

04

06

08

10

11

IMAGE: Site Boundary Plan showing the site boundary and the Allocation Site (K-4) north of Muddisdale Road, with surrounding housing, roads, buildings, open land and water features. The plan includes a north arrow. The legend reads: “Site Boundary” and “Allocation Site (K-4)”.

Figure 1: Site Boundary Plan

Site Boundary

Allocation Site (K-4)

N

1. Introduction

1.1 Background

This development brief has been prepared to inform the potential for recreational development within the area north of Muddisdale Lane (Figure 1), which includes the allocation identified as K4 from the Orkney Local Development Plan 2017 (OLDP2017). The allocation is located in the north west of Kirkwall and to the east of Kirkwall Golf Course.

1.2 Purpose

As stated in the OLDP2017, the K4 site requires a Development Brief be produced prior to seeking application. This brief has been produced to outline the suitability of the site, for its allocated use or another within the settlement statement.

1.3 Status and Use

This Development Brief will be approved as Supplementary Guidance and will be material in the consideration of planning applications on this site. It aims to provide a development concept and considerations on what supporting information future applications on this site will be expected to demonstrate. The document will also inform the review of the OLDP2017.

1.4 Policy Background

Housing Allocation K4 was established for through the OLDP2017 for long-term housing (Figure 2). The site area is 4.3 hectare and the Supplementary Guidance: Settlement Statements notes a capacity of 20 units.

Following early review of the west Kirkwall area, the need for surface water management improvements and the desire to improve the Green Infrastructure Network (GIN) around Kirkwall, it is considered that this area, including the K4 allocation provides an opportunity to strengthen the recreation and open space offer for Kirkwall, whilst tying into a wider GIN.

Such uses could be linked with the existing neighbouring Pickaquoy Estate to create a cohensive green corridor of recreational green space running from the Peedie Sea up to the Golf Course and along the Muddisdale Core Path network to Wideford Hill.

1.5 Background to work

As part of continually reviewing and working to deliver housing land; the suitability of K4 for housing development has been considered. For the surrounding location there has been significant pressure on surface water management with the creation of new housing, the location contains trees and their carbon capture value has to be considered and the future need for the Pickaquoy Centre to expand their external facilities.

IMAGE: Kirkwall Proposals Plan showing the locations of allocation sites K-1, K-2, K-3, K-4, K-5, K-6, K-7, K-8, K-9, K-10, K-11, K-12, K-13, K-14, K-15, K-16, K-17, K-18, K-19, K-20, K-21, K-22, K-23, K-24, K-25, K-26, K-27, K-28, K-29 and K-30 around Kirkwall. K-4 is shown west of the main built-up area, near K-3, K-5 and K-6. The map includes a north arrow and the following copyright text: “Based upon the Ordnance Survey mapping with the permission of the Controller of her Majesty’s Stationery Office © Crown Copyright. Unauthorised reproduction infringes Crown Copyright and may lead to prosecution or civil proceedings. Orkney Islands Council 100021621. For reference purposes only. 2016”.

Figure 2: Kirkwall Proposals Plan

K-26

K-8

K-3

K-6

K-14

K-15

K-5

K-4

K-2

K-17

K-13

K-12

K-7

K-9

K-16

K-10

K-11

K-1

K-20

K-19

K-20

K-18

K-30

K-21

K-22

K-23

K-28

K-24

K-27

K-25

K-29

Kirkwall

N

2.0 Site Context

2.1 Location

The site is located to the west of Kirkwall, in a location that is currently considered to be within the settlement edge of Kirkwall, which is open and predominantly green. The site boundary incorporates the K4 allocation, alongside additional land to the south and east. Directly to the west is the Kirkwall Golf Course with farmland beyond. On the northern boundary of the site, housing allocation K3 is currently being built out. To the south is Muddisdale Farm and Muddisdale Strategic Openspace, and to the east lies the grounds of the Pickaquoy Centre and the Orkney Rudgy Club.

2.2 Use and Topography

The site is currently in agricultural use and is part of the agronomy institute of Orkney College. There are two significant areas of Willow tree planting within the site. The site has stone dykes forming the northern, eastern and part of the southern boundary treatments with the remainder of the south being open and the western edge being post and wire and wooden fencing. The site slopes down from west to east, with an approximately 15m level change.

2.3 Access and Connectivity

The site is currently accessed through Muddlisdale Farm track to the south. This track is considered to be private and not a public road.

2.4 Biodiversity and Carbon Capture

The site is predominately crop and grassland with two blocks of trees, comprising mainly of densely planted willow. Originally planted as a potential biomass crop, they do not appear to be actively managed. The edge of the area closest to Muddisdale Strategic Openspace has a wider variety of species, but is also densely planted.

The site provides an opportunity to provide future Biodiversity enhancements as well as opportunities for carbon capture with more tree planting alongside existing trees.

2.5 Flooding and Drainage

The K4 site lies within the larger Kirkwall catchment and contributes to the Peedie Sea via the Muddisdale and Pickaquoy sub-catchments. A primary school, a number a day care centres, a leisure centre and an increasing number of houses lie within the adjacent Muddisdale and Pickaquoy sub-catchments. Currently, surface water flooding occurs frequently within both the Pickaquoy and Muddiesdale catchments. Every opportunity should be taken to minimise runoff to limit flooding in this area in future years.

IMAGE: Site Context Plan showing the site boundary west of Kirkwall Golf Course and north of Muddisdale Farm. The plan identifies existing trees, open space, neighbouring development, contours, core paths, areas adjacent to existing or proposed residential properties, future housing sites, watercourses or waterbodies and the golf course. The map includes the following legend labels: “Site Boundary”, “Existing Trees”, “Open space”, “Golf Course”, “Watercourse / Waterbody”, “Neighbouring development”, “Contours”, “Core Path”, “Adjacent to existing / proposed residential properties” and “Future housing site”. The plan includes a north arrow.

Figure 3: Site Context Plan

N

Site Boundary

Existing Trees

Open space

Neighbouring development

Contours

Core Path

Adjacent to existing / propoerties

Future housing site

Watercourse / Waterbody

Golf Course

3. Vision

3.1 Vision

The Vision for this location is to extend the existing green corridor that will provide opportunities for sustainable surface water management, tree planting, biodiversity enhancement and the strategic expansion of open space for sports and leisure.

The Your Kirkwall Place Plan (2018) highlights the need for an improved Green Infrastructure Network (GIN) within the Muddisdale Area to provide improved surface water flood management in conjunction with better connectivity and active travel infrastructure within a multi-purpose, connected green and blue landscape corridor.

The site provides the opportunity to build-on the existing GIN, incorporating natural flood management, biodiversity enhancement and improved opportunities for sports and recreation. This is in line with National Planning Framework 4; in adapting to climate change and protecting and enhancing biodviersity.

3.2 Biodiversity Value and Climate Change

Any development within the site will be required to enhance biodiversity and create more areas of shrub and woodland planting.

New woodland planting will have too increase the diversity of tree species, consider appropriate spacing for specific species, the use of planting to create shelter and therefore open areas within the planting. There is also an opportunity to connect with the wooded areas with the Muddisdale woodland by way of a woodland strip/additional planting.

In relation to climate change and carbon sequestration, research from The Woodland Trust find that 1 hectare of young woodland can capture over 400 tonnes of carbon in the trees, roots and soil.

3.3 Natural Flood Management

Incorporating the K4 site into a green infrastructure network would maximise the potential to employ natural flood management (NFM) techniques aimed at enhancing present-day flood resilience and mitigating the predicted effects of future climate change.

NFM on the site would be aimed at minimising surface water run-off, maximising groundwater recharge and surface water storage and encouraging take up by trees and other vegetation.

IMAGE: Indicative drawing of the West Kirkwall Green Infrastructure Strategy showing areas proposed or identified for enhanced Green Infrastructure Network (GIN), surface water improvements, waterbodies and watercourses, the Core Path Network and Your Kirkwall Strategic Active Travel Route 1. The plan shows a connected green corridor extending across west Kirkwall and includes a north arrow. The legend reads: “Waterbody / Watercourse”, “Areas for Surface Water improvements”, “Potential for enhanced Green Infrastructure Network (GIN)”, “Your Kirkwall Strategic Active Travel Route 1” and “Core Path Network”.

Figure 4: Indicative drawing of the West Kirkwall Green Infrastructure Strategy

Potential for enhanced Green Infrastructure Network (GIN)

Waterbody / Watercourse

Areas for Surface Water improvements

Core Path Network

Your Kirkwall Strategic Active Travel Route 1

N

4. Development Principles

Development of the site should adhere to the following principles:

Strategic Green and Blue Corridor

The site should support and tie in with the wider strategic Green Infrastructure Network (GIN) of Muddisdale.

Connected and Varied Open Space

The site and proposed use should compliment and build on the existing openspace offer in this part of Kirkwall and the Pickaquoy Centre Estate.

Surface Water Management

Development of the site should carefully consider it’s impact and opportunity to improve the surface water manaement within the wider context of the Muddisdale and west Kirkwall Area.

Tree Preservation and Enhancement

Development of the site should seek to retain the existing tree planting and include opportunites to provide additional planting.

Connectivity and Active Travel

The site and its use should be de designed to favour access by modes of Active Travel, utilising the existing core path connections in its immediate context. Proposals should seek to demonstrate how private vehicle access will be minimise or negated where appropriate.

Sustainable Design and Construction

Proposals should follow sustaiable design and construction methods, limiting impact on the existing landscape and neighbouring dwellings.

IMAGE: Infographic presenting the six development principles with coloured circular icons representing a green and blue corridor, connected open space, surface water management, tree preservation and enhancement, connectivity and active travel, and sustainable design and construction. The accompanying wording is: “Strategic Green and Blue Corridor — The site should support and tie in with the wider strategic Green Infrastructure Network (GIN) of Muddisdale.” “Connected and Varied Open Space — The site and proposed use should compliment and build on the existing openspace offer in this part of Kirkwall and the Pickaquoy Centre Estate.” “Surface Water Management — Development of the site should carefully consider it’s impact and opportunity to improve the surface water management within the wider context of the Muddisdale and west Kirkwall Area.” “Tree Preservation and Enhancement — Development of the site should seek to retain the existing tree planting and include opportunities to provide additional planting.” “Connectivity and Active Travel — The site and its use should be designed to favour access by modes of Active Travel, utilising the existing core path connections in its immediate context. Proposals should seek to demonstrate how private vehicle access will be minimise or negated where appropriate.” “Sustainable Design and Construction — Proposals should follow sustainable design and construction methods, limiting impact on the existing landscape and neighbouring dwellings.”

5. Delivery and Monitoring

5.1 Future Planning Applications

It is considered that future leisure and recreational users, when seeking planning persmission, need to consider and include within the applications:

  • Design principles and design statement.

  • Landscape plan, including any changes to levels.

  • Management and Maintenance plan.

  • Services information including SUDS proposal and Scottish Water correspondence (if appropriate).

  • Flood risk information.

  • Transport statement.

  • Ecology and ground water statement.

  • Archaeology statement.

  • Existing Tree survey and Planting Plan.

  • Construction method statement.

Any pre-application advice is completed by the Development Management Team (planning@orkney.gov.uk)

For further information please contact Development and Marine Planning team by email: devplan@orkney.gov.uk