Employment Land Audit Orkney: Local Development Plan 2017
Employment Land Audit 2023
The tables below outline the full audit of the Employment Land Allocations as specified in the Orkney Local Development Plan 2017 (Business and Industrial Allocations).
This document will be updated annually for the duration of the plan, keeping a record of remaining capacity for each site as well as outlining constraints, when they become apparent. Where it is stated that there are no current constraints on a site, it is accepted that it may be possible for development constraints to come to light on receipt of a development brief or planning application.
Summary
| Town | Total Area (ha) | Land Available |
|---|---|---|
| Kirkwall | 60 | 49.8 |
| Stromness | 14.8 | 14.8 |
Contents
Kirkwall — 2
Stromness — 5
Kirkwall
Hatston West
| Site Reference | Status | Settlement Type | Ownership | Size (ha) | Land Type |
|---|---|---|---|---|---|
| K - 18 | Undeveloped | Town | Private | 7.0 | Greenfield |
| Available Land (ha) | 2023/2024 | 2024/2025 | 2025/2026 | 2026/2027 | 2027/2028 |
|---|---|---|---|---|---|
| Hatston West | 7.0 |
Comments/Constraints: Change of use was submitted – along with part of K-19 (from agricultural to harbour operational land) but was withdrawn.
Development Brief Required
Coastal Flood Risk on small part of the site. Flood risk assessment may be required
Hatston Marine Park
| Site Reference | Status | Settlement Type | Ownership | Size (ha) | Land Type |
|---|---|---|---|---|---|
| K - 19 | Partially developed | Town | Private | 15.2 | Greenfield |
| Available Land (ha) | 2023/2024 | 2024/2025 | 2025/2026 | 2026/2027 | 2027/2028 |
|---|---|---|---|---|---|
| Hatston Marine Park | 5ha (est) |
Comments/Constraints: Most of this site has been developed, difficult to place a figure on the land still available. Potentially developable land to the west of the site.
Park of Crowness Business Park Development Brief.
Coastal Flood Risk on small part of the site. Flood risk assessment may be required
Orkney Auction Mart
| Site Reference | Status | Settlement Type | Ownership | Size (ha) | Land Type |
|---|---|---|---|---|---|
| K - 20 | Undeveloped | Town | Private | 26.6 | Greenfield |
| Available Land (ha) | 2023/2024 | 2024/2025 | 2025/2026 | 2026/2027 | 2027/2028 |
|---|---|---|---|---|---|
| Orkney Auction Mart | 26.6 |
Comments/Constraints: No major development approved apart from an extension to the mart
Coastal Flood Risk on the northern part of the site.
Hatston South
| Site Reference | Status | Settlement Type | Ownership | Size (ha) | Land Type |
|---|---|---|---|---|---|
| K - 21 | Undeveloped | Town | Private | 5.4 | Greenfield |
| Available Land (ha) | 2023/2024 | 2024/2025 | 2025/2026 | 2026/2027 | 2027/2028 |
|---|---|---|---|---|---|
| Hatston South | 5.4 |
Comments/Constraints: A development brief required which would jointly cover (housing allocations) K-1 and K-2.
A combined sewer may lie within the site and early contact with Scottish Water is encouraged.
See Settlement Statement for access provision.
Orkney Research Campus
| Site Reference | Status | Settlement Type | Ownership | Size (ha) | Land Type |
|---|---|---|---|---|---|
| K - 30 | Undeveloped | Town | Private | 5.8 | Greenfield |
| Available Land (ha) | 2023/2024 | 2024/2025 | 2025/2026 | 2026/2027 | 2027/2028 |
|---|---|---|---|---|---|
| Orkney Research Campus | 5.8 |
Comments/Constraints: New nursery under construction next to the college adjacent to this site. Nursery site is mostly on the open space allocation, with small encroachment into K-30.
Small part of the site has surface water flooding. A flood risk assessment may be required, and areas of risk should be avoided.
A water course on the boundary of the site that is partly culverted. Any development should allow for an appropriate buffer strip for this water course.
Stromness
Garson Industrial Estate
| Site Reference | Status | Settlement Type | Ownership | Size (ha) | Land Type |
|---|---|---|---|---|---|
| STR - 20 | Partially developed | Town | Private | 9.5 | Significantly developed already, with capacity available north and south of the allocation |
| Available Land (ha) | 2023/2024 | 2024/2025 | 2025/2026 | 2026/2027 | 2027/2028 |
|---|---|---|---|---|---|
| Garson Industrial Estate | 9.5 |
Comments/Constraints: Part has a fluvial flood risk with the Mill Burn running through the site. A Flood risk assessment may be required. Buffer required around the burn.
Copland’s Dock North
| Site Reference | Status | Settlement Type | Ownership | Size (ha) | Land Type |
|---|---|---|---|---|---|
| STR - 21 | Undeveloped | Town | Private | 0.7 | Greenfield |
| Available Land (ha) | 2023/2024 | 2024/2025 | 2025/2026 | 2026/2027 | 2027/2028 |
|---|---|---|---|---|---|
| Copland’s Dock North | 0.7 |
Comments/Constraints: Part of Copland’s Dock Development Brief.
A Flood risk assessment required to establish impact of coastal flooding.
Development on this site should not have an adverse affect on the setting of Garson House.
Copland’s Dock South
| Site Reference | Status | Settlement Type | Ownership | Size (ha) | Land Type |
|---|---|---|---|---|---|
| STR - 22 | Undeveloped | Town | Private | 4.6 | Greenfield |
| Available Land (ha) | 2023/2024 | 2024/2025 | 2025/2026 | 2026/2027 | 2027/2028 |
|---|---|---|---|---|---|
| Copland’s Dock South | 4.6 |
Comments/Constraints: Part of Copland’s Dock Development Brief.
A Flood risk assessment required to establish impact of coastal flooding.
Development on this site should not have an adverse affect on the setting of Garson House.