Orkney Islands Council Local Development Plan
Delivery Programme March 2025
www.orkney.gov.uk
IMAGE: Cover photograph showing an Orkney landscape at sunset, with standing stones, sheep grazing in a field, the Orkney Islands Council crest, and the text “Orkney Islands Council Local Development Plan Delivery Programme March 2025” and “www.orkney.gov.uk”.
Contents
- Introduction
- Background
- What is a Delivery Programme?
- The Orkney Island Council Delivery Programme
- Schedule 1 - Delivery Programme: Proposals
- Schedule 2 - Delivery Programme: Policies
Introduction
The Council’s statutory local development plan when adopted in 2017 was accompanied by a Delivery Programme to support the delivery of the Local Development Plan. This Delivery Programme will replace the Delivery Programme adopted in 2017.
Background
In response to the letter received from the Chief Planner there has been a review undertaken of information contained in the existing Housing Land Audit, Strategic Housing Investment Plan and previous information from stakeholders and landowners to prepare an updated Delivery Plan for the existing Orkney Local Development Plan. This includes considering the information needed to show a Deliverable Housing Land Pipeline.
What is a Delivery Programme?
The purpose of the Delivery Programme is to support the delivery of the Orkney Island Council Local Development Plan 2017 (OLDP) by setting out the actions and partnerships that are necessary to implement the strategy of the Plan. In accordance with legislative requirements, the Delivery Programme, as a minimum, must set out:
- a list of actions required to deliver policies and proposals contained in the OLDP;
- an explanation as to how those actions are to be undertaken;
- the timescale for the conclusion of each action; and
- the expected sequencing of, and timescales for, delivery of housing on sites allocated by the LDP (a ‘housing delivery pipeline’).
The Orkney Island Council Delivery Programme
The Delivery Programme, set out at in Schedule 1 and 2, outlines the actions required to support future development across Orkney. The Delivery Programme is structured according to the different allocations in settlements and highlights where there is relevant infrastructure considerations needed to progress delivery. It also sets out actions needed to help deliver the policies contained in the Local Development Plan. With work underway on developing a new Local Development Plan many of the actions will form part of the review of the new Local Development Plan and sites will also be reviewed as part of the preparation of the new Local Development Plan.
It should be noted that many of the sites which are allocated for development within the Local Development Plan are within private ownership therefore the timing at which sites come forward is largely outwith the control of Planning Authority. However, the Delivery Programme can be a way to facilitate development.
On viewing the remaining allocated sites within the Local Development Plan there are still many allocated sites that are available for development. These are of various sizes and locations across the different settlements of Orkney.
The Housing Land Audit has consistently demonstrated that significant numbers of new houses are delivered in Orkney through windfall development. Windfall development means planning permission has been granted on sites not specifically allocated for development in the Local Development Plan so would apply to conversions of existing buildings, small-scale infill developments within settlements or as housing developments in the countryside. With the ad hoc nature of windfall development, it isn’t specifically covered in the Delivery Programme.
This Delivery Programme sets out a Delivery Pipeline with the expected timescales for delivery of housing on sites allocated by the OLDP categorised into short term: years 1-3, medium term: years 4-6 and long term: years 7-10.
The Delivery Programme will be a useful tool to help stimulate development within the allocated sites, highlighting where there is still capacity for development in the current Local Development Plan allocations. It will also assist in developing suitable approaches to development where closer work is needed with infrastructure providers and landowners and provide a resource to show where updates or further research is required to support policies for the next Local Development Plan.
Schedule 1 - Delivery Programme: Proposals
Kirkwall Proposals
| Settlement | Site Number | Use | Ownership | Actions needed for delivery | Pipeline for Delivery | Current Stage | Progress Notes | Site/General Notes |
|---|---|---|---|---|---|---|---|---|
| Kirkwall | K-1 | Housing | Private | Development Brief required | Long Term | No progress | - | - |
| Kirkwall | K-2 | Housing | Private | Development Brief required | Long Term | No progress | - | - |
| Kirkwall | K-3 | Housing | Mixed | Development Brief required, SWMP outcomes needed | Long Term | Partially developed | Part of site built out, application on private area of land submitted | OIC owned land - no progress, Private Land - submission for housing received. |
| Kirkwall | K-5 | Housing | Mixed | - | Short Term | Partially developed | Phases on site with final stages approved | - |
| Kirkwall | K-6 | Housing | Public | Updated Development Brief required | Medium Term | Partially developed | Care Home on site, Housing Application approved | Application approved for Care Home (21/069/PP) and Housing (19/014/PPMAJ). Care Home development on site. |
| Kirkwall | K-7 | Housing | Private | Development Brief required | Medium Term | No progress | - | - |
| Kirkwall | K-8 | Housing | Private | New Development Brief required, Scottish Water upgrades, Archaeology investigations | Long Term | No progress | - | Area within Highland Park Catchment |
| Kirkwall | K-9 | Housing | Private | Scottish Water upgrades and Drainage | Medium Term | Application Stage | - | Area within Highland Park Catchment |
| Kirkwall | K-10 | Housing | Private | Review of HSE offset, Infrastructure issues | Long Term | Site on the market | - | Area within Highland Park Catchment |
| Kirkwall | K-11 | Housing | Private | - | Long Term | No Progress | - | Area within Highland Park Catchment |
| Kirkwall | K-12 | Housing | Private | - | - | No Progress | - | - |
| Kirkwall | K-13 | Housing | Private | - | - | No Progress | - | - |
| Kirkwall | K-14 | Housing | Public | Development Brief required, SWMP outcomes needed | Long Term | No Progress | - | - |
| Kirkwall | K-15 | Housing | Public | Development Brief required, Infrastructure queries and access | Long Term | No progress | - | The existing Waterfield Development Brief does not cover all the allocation and will therefore have to be reviewed. |
| Kirkwall | K-16 | Housing | Public | Developed | - | Completed | - | - |
| Kirkwall | K-18 | Business & Industrial | Public | - | - | No progress | - | - |
| Kirkwall | K-19 | Business & Industrial | Public | - | - | No progress | - | - |
| Kirkwall | K-20 | Business & Industrial | Private | - | Medium Term | No progress | - | - |
| Kirkwall | K-21 | Business & Industrial | Private | Joint Development Brief with K-1 & K-2. Review of land use as part of next LDP | Long Term | No progress | - | Submitted within call for sites as potential Housing land. |
| Kirkwall | K-22 | Redevelopment | Public | Development Brief is required, Land contamination/mitigation surveys required, Heritage/building surveys required | Long Term | No Progress | - | Site is still within ownership of NHS |
| Kirkwall | K-23 | Mixed Use | Public | Mixed use element of proposals requires funding. SEPA situation regarding coastal flooding requires resolution for housing development. | Medium Term | Early concept | - | HOUSING - There is a coastal, fluvial and pluvial high flooding risk. Coastal flood risk issues with SEPA need to be resolved. Project exploring development opportunity for collections archive within part of the site. |
| Kirkwall | K-23 | Mixed Use | Public | Mixed use element of proposals requires funding. SEPA situation regarding coastal flooding requires resolution for housing development. | Medium Term | Early concept | - | HOUSING - There is a coastal, fluvial and pluvial high risk flood risk on this site. Coastal flood risk issues with SEPA need to be resolved. Museums and stores exploring development opportunity for archive facility within part of the site, with later removal of former bowling alley building. |
| Kirkwall | K-24 | Mixed Use | Private | Flood Risk Management Required | Long Term | No progress | - | HOUSING - There is a coastal, fluvial and pluvial high risk flood risk on this site. Coastal flood risk issues with SEPA need to be resolved. |
| Kirkwall | K-25 | Mixed Use | Private | Joint Development Brief/Masterplan required with K-26 & K-27. Phase 1 Archaeological study undertaken. Stage 1 Mitigation Survey undertaken | Long Term | Temporary Application for Retail/Leisure use | Temporary application is being developed out on site. | Permission given for temporary use for retail, leisure, open space and night club use. Application to make permanent would be required. SEPA coastal flooding issues across whole of site for sensitive uses. |
| Kirkwall | K-26 | Mixed Use | Private | Joint Development Brief/Masterplan required with K-26 & K-27. Phase 1 Archaeological study undertaken. Stage 1 Mitigation Survey undertaken | Long Term | No progress | - | Recently sold. SEPA coastal flooding issues across whole of site for sensitive uses. |
| Kirkwall | K-27 | Mixed Use | Private | Joint Development Brief/Masterplan required with K-26 & K-27. Phase 1 Archaeological study undertaken. Stage 1 Mitigation Survey undertaken | Long Term | No progress | - | Site still occupied by current users |
| Kirkwall | K-28 | Redevelopment Site | Public | Updated masterplan/development brief needed. Understanding of Education Service need for space/services. Program and plan for special school funding and land requirements | Long Term | Early discussions | - | Potential issues with contamination within existing buildings. Funding requirements unclear |
| Kirkwall | K-29 | Redevelopment | Public | Listed Building/structures on site - requirement for investigation. Updated masterplan/development brief required | Long Term | No progress | - | Listed Building/structures. Would require specialist designers and potential external funding for delivery. |
| Kirkwall | K-30 | Business & Industrial/Educational | Public | Updated development Brief required. Understanding of UHI expansions requirements needed. | Long Term | Partial development | Development of nursery consented on part of site | Review of land use as part of next LDP |
Figure 1 - Map of Kirkwall Allocations
IMAGE: Map of Kirkwall showing the settlement boundary and allocation sites K-1 through K-30, including housing, business and industrial, mixed-use, redevelopment and educational allocations around Kirkwall, Hatston, St Ola and the surrounding coastline.
Stromness Proposals
| Settlement | Site Number | Use | Ownership | Actions needed for delivery | Pipeline for Delivery | Current Stage | Progress Notes | Site/General Notes |
|---|---|---|---|---|---|---|---|---|
| Stromness | STR-1 | Housing | Private | - | Long Term | No progress | - | - |
| Stromness | STR-2 | Housing | Public | Access issues, requires full assessment and exploration of access | Long Term | Early discussions | - | - |
| Stromness | STR-3 | Housing | Private | Culverted watercourse on site - drainage and flooding assessment required), Development Brief required for the site, Foul drainage capacity requires exploration | Long Term | Early discussions | - | - |
| Stromness | STR-4 | Housing | Private | - | Long Term | No progress | - | - |
| Stromness | STR-5 | Housing | Private | - | Short Term | Consented | Application in for amendment to house location based on conditions | Application approved (22/382/PP) |
| Stromness | STR-6 | Housing | Private | - | - | Completed | - | - |
| Stromness | STR-7 | Housing | Private | - | Medium Term | No progress | - | - |
| Stromness | STR-8 | Housing | Public | - | Medium Term | Partially developed | Care Home completed | Care Home completed, rest of land undeveloped |
| Stromness | STR-9 | Housing | Private | Development Brief requires update, inc. constraints impact | Long Term | No progress | - | Application submitted on part of allocation (23/189/PP) - Refused |
| Stromness | STR-10 | Housing | Private | - | - | Completed | - | - |
| Stromness | STR-11 | Housing | - | - | - | - | - | - |
| Stromness | STR-12 | Housing | Public | - | - | - | - | - |
| Stromness | STR-13 | Housing | - | - | - | - | - | - |
| Stromness | STR-14 | Housing | Private | South End Dev Brief adopted. | Medium Term | No progress | Landowners issued with dev brief | - |
| Stromness | STR-15 | Housing | Private | South End Dev Brief adopted. | Medium Term | No progress | Landowners issued with dev brief | - |
| Stromness | STR-16 | Housing | Private | South End Dev Brief adopted. Infrastructure surveys inc. drainage, foul water and access required. Geological survey needed | Long Term | No progress | Landowners issued with dev brief | Multiple Private owners. Integration into existing sewage network would be required. Access and road/path improvements required. Geological investigations needed |
| Stromness | STR-17 | Housing | Mixed | South End Dev Brief adopted. Infrastructure surveys inc. drainage, foul water and access required. Geological survey needed | Long Term | No progress | Landowners issued with dev brief | Site contains large area of marshland. Part Private, part OHAL ownership. Integration into existing sewage network would be required. Cross site pedestrian connections also required |
| Stromness | STR-18 | Housing | Private | South End Dev Brief adopted. Infrastructure surveys inc. drainage, foul water and access required. Geological survey needed | Long Term | No progress | Landowners issued with dev brief | Steeply sloping areas of the site which are unsuitable for development. Access and internal connections need consideration. Green/Blue corridor along May Burn within site |
| Stromness | STR-20 | Business & Industrial | Mixed | No Action Required | - | - | - | - |
| Stromness | STR-21 | Business & Industrial | Public | No Action Required | - | - | - | - |
| Stromness | STR-22 | Business & Industrial | Public | No Action Required | - | - | - | - |
| Stromness | STR-23 | Redevelopment | Private | No Action Required | - | partially developed | - | Co-op redeveloped on northern end. |
| Stromness | STR-24 | Redevelopment | Private | No Action Required | - | early discussions | - | - |
| Stromness | STR-25 | Redevelopment | Private | No Action Required | - | Early concept | - | - |
| Stromness | STR-26 | Redevelopment | Private | Development Brief Required, Retention of historic building/structures required | - | - | - | - |
Figure 2 - Map of Stromness Allocations
IMAGE: Map of Stromness showing allocation sites STR-1 through STR-26 around the town, harbour, coastline, roads and surrounding areas.
Dounby Proposals
| Settlement | Site Number | Use | Ownership | Actions needed for delivery | Pipeline for Delivery | Current Stage | Progress Notes | Site/General Notes |
|---|---|---|---|---|---|---|---|---|
| Dounby | DY-1 | Housing | Private | - | Short Term | Partially developed | - | Partially developed, 1/2 plots remaining |
| Dounby | DY-2 | Housing | Private | - | Long Term | No Progress | - | - |
| Dounby | DY-3 | Housing | Private | - | Short Term | Application Stages | - | Application submitted (23/383/PP) No decision |
| Dounby | DY-4 | Housing | Private | Water Main crossing site - investigation required, Development Brief required | Medium Term | No Progress | - | - |
| Dounby | DY-5 | Housing | Private | Access requires exploration, foul and drainage studies required. | Long Term | No Progress | - | - |
| Dounby | DY-6 | Housing | Private | Requested removal from next Plan | N/A | No Progress | - | - |
| Dounby | DY-7 | Housing | Private | Requested removal from next Plan | N/A | No Progress | - | - |
Figure 3 - Map of Dounby Allocations
IMAGE: Map of Dounby showing allocation sites DY-1 through DY-7 around the settlement, including roads, watercourses and surrounding land.
Finstown Proposals
| Settlement | Site Number | Use | Ownership | Actions needed for delivery | Pipeline for Delivery | Current Stage | Progress Notes | Site/General Notes |
|---|---|---|---|---|---|---|---|---|
| Finstown | F-1 | Housing | Mixed | Development Brief required, within HSE zone for the quarry, topography and level require investigation for good design and drainage requirements. Burn within top of site boundary | Medium Term | No progress | - | - |
| Finstown | F-2 | Housing | Private | Development Brief required, Burn crossing site, drainage/flooding investigation required, | Medium Term | No Progress | - | - |
| Finstown | F-3 | Housing | Private | Development Brief required, Heritage and setting impact on Cuween Hill need to be considered, Watercourse within the site boundary - flooding and drainage study required and potential de-culverting works needed. | Long Term | No Progress | - | - |
| Finstown | F-4 | Housing | Private | Setting of Cuween Hill needs to be considered. | Long Term | No Progress | - | - |
| Finstown | F-5 | Housing | Private | Adjacent to Scheduled Monument, Impact of development on archaeology and heritage requires investigation, Water main within site boundary, Coastal flooding within site - flood assessment required | Long Term | No Progress | - | - |
Figure 4 - Map of Finstown Allocations
IMAGE: Map of Finstown showing allocation sites F-1 through F-5 around the settlement, The Ouse, the A965 and surrounding watercourses, coastline and heritage areas.
St Margaret’s Hope Proposals
| Settlement | Site Number | Use | Ownership | Actions needed for delivery | Pipeline for Delivery | Current Stage | Progress Notes | Site/General Notes |
|---|---|---|---|---|---|---|---|---|
| St Margaret's Hope | SMH-1 | Housing | Private | Partially developed out | Long Term | Partially developed | - | One plot built out. One plot remaining |
| St Margaret's Hope | SMH-2 | Housing | Public | - | Long Term | No Progress | - | - |
| St Margaret's Hope | SMH-3 | Housing | Public | - | Short Term | Early discussions | - | Hope Co-housing project |
| St Margaret's Hope | SMH-4 | Housing | Public | - | Long Term | No Progress | - | - |
| St Margaret's Hope | SMH-5 | Housing | Private | Flooding and Drainage assessment required, Access and Transport access required. | Long Term | Pre-app | - | Pre-app discussions have occurred on an area that covers part of the site |
Figure 5 - Map of St Margaret’s Hope Allocations
IMAGE: Map of St Margaret’s Hope showing allocation sites SMH-1 through SMH-5 around the settlement, harbour, coastline, roads and surrounding land.
Stenness Proposals
| Settlement | Site Number | Use | Ownership | Actions needed for delivery | Pipeline for Delivery | Current Stage | Progress Notes | Site/General Notes |
|---|---|---|---|---|---|---|---|---|
| Stenness | STE-1 | Housing | Private | Flood and drainage assessment required due to surface water and flooding issues | Long Term | No progress | - | - |
| Stenness | STE-2 | Housing | Private | - | Long Term | No progress | - | - |
Figure 6 - Map of Stenness Allocations
IMAGE: Map of Stenness showing allocation sites STE-1 and STE-2 on either side of the A965, with surrounding drainage, settlement and open land.
Toab Proposals
| Settlement | Site Number | Use | Ownership | Actions needed for delivery | Pipeline for Delivery | Current Stage | Progress Notes | Site/General Notes |
|---|---|---|---|---|---|---|---|---|
| Toab | TB-1 | Housing | Private | - | - | Application Granted | - | Application (24/008/PP) granted for 10 homes |
| Toab | TB-2 | Housing | Private | - | - | Application Granted | - | Application (19/367/PP) granted for 16 homes |
| Toab | TB-3 | Housing | Private | Flood Risk Assessment Required due to Coastal flooding location | Medium Term | Partially developed | - | - |
| Toab | TB-4 | Housing | Public | Flood Risk Assessment Required due to Coastal flooding location | Medium Term | No progress | - | - |
| Toab | TB-5 | Housing | Private | Drainage and foul water treatment capacity required assessment. | Long Term | No progress | - | - |
Figure 7 - Map of Toab Allocations
IMAGE: Map of Toab showing allocation sites TB-1 through TB-5 along the A960 and the coastal area around Deer Sound, with drainage, mudflats and surrounding settlement.
Burray Village Proposals
| Settlement | Site Number | Use | Ownership | Actions needed for delivery | Pipeline for Delivery | Current Stage | Progress Notes | Site/General Notes |
|---|---|---|---|---|---|---|---|---|
| Burray Village | BV-1 | Housing | Private | - | - | Completed | - | - |
| Burray Village | BV-2 | Housing | Public | Pedestrian access required to neighbouring housing to create off-road link | Long Term | No progress | - | - |
| Burray Village | BV-3 | Housing | Public | Pedestrian access required from school to housing to create off-road link | Long Term | No progress | - | - |
| Burray Village | BV-4 | Housing | Private | Development brief required with BV-5. Drainage assessment required and consideration for neighbouring allocations and future infrastructure. | Long Term | No progress | - | - |
| Burray Village | BV-5 | Housing | Private | Development brief required with BV-4. Drainage assessment required and consideration for neighbouring allocations and future infrastructure. Watercourse on-site (culverted) capacity and flood assessment required to inform design and infrastructure | Long Term | No progress | - | - |
| Burray Village | BV-6 | Housing | Private | - | Short Term | On-site | - | Application 21/269/AMC granted |
Figure 8 - Map of Burray Allocations
IMAGE: Map of Burray Village showing allocation sites BV-1 through BV-6 around the village, coastline, roads, school, playing field and surrounding watercourses.
Evie Village Proposals
| Settlement | Site Number | Use | Ownership | Actions needed for delivery | Pipeline for Delivery | Current Stage | Progress Notes | Site/General Notes |
|---|---|---|---|---|---|---|---|---|
| Evie Village | EV-1 | Housing | Private | - | - | Completed | - | - |
| Evie Village | EV-2 | Housing | Private | Canalised burn within boundary, drainage and offset requirements needed to be explored | Medium Term | No progress | - | - |
| Evie Village | EV-3 | Housing | Private | Water Main within boundary. | Short Term | Application approved | - | Application 21/029/PP granted |
| Evie Village | EV-3 | Housing | Private | Future connections to long term allocation required to be provided | Long Term | No progress | - | - |
| Evie Village | EV-5 | Housing | Private | - | Long Term | No progress | - | - |
Figure 9 - Map of Evie Village Allocations
IMAGE: Map of Evie Village showing allocation sites EV-1 through EV-5 along the A966, including the settlement, watercourses, roads and surrounding land.
Orphir Village Proposals
| Settlement | Site Number | Use | Ownership | Actions needed for delivery | Pipeline for Delivery | Current Stage | Progress Notes | Site/General Notes |
|---|---|---|---|---|---|---|---|---|
| Orphir | OR-1 | Housing | Private | - | - | Completed | - | - |
| Orphir | OR-2 | Housing | Private | Foul drainage capacity and connection options require assessment | Medium Term | Partial | Permission granted to one plot at front of site | Site in multiple ownership, part of the site granted planning permission 24/068/PP for one dwelling, access to rest of site still possible |
| Orphir | OR-3 | Housing | Private | Utilities on-site, assessment required and permissions to move would be required | Long Term | No Progress | - | - |
| Orphir | OR-4 | Housing | Private | - | - | Completed | - | - |
| Orphir | OR-5 | Housing | Private | Drainage and flood risk assessment required on the site due to watercourse and well within boundary. Biodiversity value of parts of the site require assessment | Long Term | No Progress | - | - |
| Orphir | OR-6 | Housing | Private | Access to the site might require road/junction improvements | Long Term | No Progress | - | - |
Figure 10 - Map of Orphir Allocations
IMAGE: Map of Orphir showing allocation sites OR-1 through OR-6 around the settlement and A964, including drains, a wind turbine, reservoir, school and surrounding land.
Quoyloo Proposals
| Settlement | Site Number | Use | Ownership | Actions needed for delivery | Pipeline for Delivery | Current Stage | Progress Notes | Site/General Notes |
|---|---|---|---|---|---|---|---|---|
| Quoyloo | Q-1 | Housing | Private | Foul drainage capacity and connection options require assessment | Medium Term | No Progress | - | - |
| Quoyloo | Q-2 | Housing | Private | Foul drainage capacity and connection options require assessment, including assessment of culverted drain within site | Long Term | No Progress | - | - |
| Quoyloo | Q-3 | Housing | Private | Foul drainage capacity and connection options require assessment | Long Term | No Progress | - | - |
| Quoyloo | Q-4 | Housing | Private | Foul drainage capacity and connection options require assessment | Long Term | No Progress | - | - |
| Quoyloo | Q-5 | Housing | Private | Foul drainage capacity and connection options require assessment | Long Term | No Progress | - | - |
| Quoyloo | Q-6 | Housing | Private | Foul drainage capacity and connection options require assessment | Medium Term | Partial | Application granted on part of site | Application 24/108/PP granted permission for 2 homes, western and northern part of the site undeveloped. |
| Quoyloo | Q-7 | Housing | Private | Foul drainage capacity and connection options require assessment | Long Term | No Progress | - | - |
Figure 11 - Map of Qouyloo Allocations
IMAGE: Map of Quoyloo showing allocation sites Q-1 through Q-7 around Quoyloo and Scarwell, with roads, drains and surrounding countryside.
St Mary’s Proposals
| Settlement | Site Number | Use | Ownership | Actions needed for delivery | Pipeline for Delivery | Current Stage | Progress Notes | Site/General Notes |
|---|---|---|---|---|---|---|---|---|
| St Mary's | STM-1 | Housing | Private | Development Brief/masterplan required for STM-1, STM-2 and STM-3, STM-4 & STM-6 (potentially inc. STM-5), Drainage and flooding assessment required for whole site (potentially covering STM1-3), consideration of scheduled ancient monument to the west of the site, Access and Transport Assessment required due to scale of site. Pedestrian and vehicle connectivity between neighbouring allocations would be required | Long Term | No Progress | - | - |
| St Mary's | STM-2 | Housing | Private | Development Brief/masterplan required for STM-1, STM-2 and STM-3, STM-4 & STM-6 (potentially inc. STM-5), Drainage and flooding assessment required for whole site (potentially covering STM1-3), Access and Transport Assessment required due to scale of site. Pedestrian and vehicle connectivity between neighbouring allocations would be required | Long Term | No Progress | - | - |
| St Mary's | STM-3 | Housing | Private | Development Brief/masterplan required for STM-1, STM-2 and STM-3, STM-4 & STM-6 (potentially inc. STM-5), Drainage and flooding assessment required for whole site (potentially covering STM1-3), Access and Transport Assessment required due to scale of site. Pedestrian and vehicle connectivity between neighbouring allocations would be required | Long Term | No Progress | - | - |
| St Mary's | STM-4 | Housing | Private | Development Brief/masterplan required for STM-1, STM-2 and STM-3, STM-4 & STM-6 (potentially inc. STM-5), Drainage and flooding assessment required for whole site (potentially covering STM1-3), Access and Transport Assessment required due to scale of site. Pedestrian and vehicle connectivity between neighbouring allocations would be required | Long Term | No Progress | - | - |
| St Mary's | STM-5 | Housing | Public | Development Brief/masterplan required for STM-1, STM-2 and STM-3, STM-4 & STM-6 (potentially inc. STM-5) | Long Term | No Progress | - | - |
| St Mary's | STM-6 | Housing | Public | Development Brief/masterplan required for STM-1, STM-2 and STM-3, STM-4 & STM-6 (potentially inc. STM-5) | Long Term | No Progress | - | - |
| St Mary's | STM-7 | Housing | Private | Road and path improvements would be required to connect the site to the village | Long Term | No Progress | - | - |
| St Mary's | STM-8 | Housing | Private | Road and path improvements would be required to connect the site to the village | Long Term | No Progress | - | - |
Figure 12 - Map of St Mary’s Allocations
IMAGE: Map of St Mary’s showing allocation sites STM-1 through STM-8 along the settlement and the Bay of Ayre, with the A961, coastline and surrounding land.
The Palace Proposals
| Settlement | Site Number | Use | Ownership | Actions needed for delivery | Pipeline for Delivery | Current Stage | Progress Notes | Site/General Notes |
|---|---|---|---|---|---|---|---|---|
| The Palace | P-1 | Housing | Private | Access from public road would require upgrade and improvements. Long-term issues surrounding coastal erosion and promoting land that requires access from at-risk roads/road sections. High potential for archaeological interest in the area, assessment required. | Long Term | No Progress | - | Landscape and heritage sensitivities within the area due to numerous Scheduled Ancient Monuments, and historic/listed buildings. Consideration of appropriate of scale, massing, design and siting would be required for any development. |
| The Palace | P-2 | Housing | Private | Fluvial and Surface Water Flooding to part of the site. Full drainage and flooding assessment required to consider appropriate areas for development. Highly constrained road network through village, road widening not feasible in places due to Heritage features and existing buildings. Review of appropriateness to promote land with highly constrained access should be continued as part of next LDP. High potential for archaeological interest in the area, assessment required. | Long Term | No Progress | - | Landscape and heritage sensitivities within the area due to numerous Scheduled Ancient Monuments, landscape features and historic/listed buildings. Consideration of appropriate of development scale, massing, design and siting would be required for any development. |
| The Palace | P-3 | Housing | Private | Highly constrained road network through the village, widening not feasible in places due to Heritage features and existing buildings. Review of appropriateness to promote land with constrained access should be continued as part of next LDP. High potential for archaeological interest in the area, assessment required. | Long Term | No Progress | - | Landscape and heritage sensitivities due to Scheduled Ancient Monuments, and historic/listed buildings. Consideration of appropriate of scale, massing, design and siting would be required for any development. |
| The Palace | P-4 | Housing | Private | Highly constrained road network through the village, widening not feasible in places due to Heritage features and existing buildings. Review of appropriateness to promote land with constrained access should be continued as part of next LDP. High potential for archaeological interest in the area, assessment required. | Long Term | No Progress | - | Landscape and heritage sensitivities within the area due to numerous Scheduled Ancient Monuments, and historic/listed buildings. Consideration of appropriate of scale, massing, design and siting would be required for any development. |
Figure 13 - Map of The Palace Allocations
IMAGE: Map of The Palace showing allocation sites P-1 through P-4 near the coastline, Palace Edens, Earl’s Palace, Bishop’s Palace and surrounding heritage features.
Burnside, Harray Proposals
| Settlement | Site Number | Use | Ownership | Actions needed for delivery | Pipeline for Delivery | Current Stage | Progress Notes | Site/General Notes |
|---|---|---|---|---|---|---|---|---|
| Burnside, Harray | BH-1 | Housing | Private | Road upgrades and widening would be required, drainage and foul assessment and shared infrastructure required | Long Term | No Progress | - | - |
| Burnside, Harray | BH-2 | Housing | Private | Utilities on-site, assessment required and permissions to move would be required | Medium Term | No Progress | - | - |
| Burnside, Harray | BH-3 | Housing | Private | Utilities on-site, assessment required and permissions to move would be required | Long Term | No Progress | - | - |
| Burnside, Harray | BH-4 | Housing | Private | - | Short Term | No Progress | - | Single unit development within settlement boundary - would classify as infill |
Figure 14 - Map of Burnside Allocations
IMAGE: Map of Burnside, Harray showing allocation sites BH-1 through BH-4 around Appietown, roads, Burn of Netherbrough, playing field and surrounding land.
Evie School Proposals
| Settlement | Site Number | Use | Ownership | Actions needed for delivery | Pipeline for Delivery | Current Stage | Progress Notes | Site/General Notes |
|---|---|---|---|---|---|---|---|---|
| Evie School | ES-1 | Housing | Private | Access upgrades required to junction and road, visibility issues require consideration, Shared foul drainage required | Long Term | Early discussions | - | - |
| EVIE SCHOOL | ES-2 | Housing | Private | Access upgrades required to junction and road, visibility issues require consideration, Shared foul drainage required. | Long Term | Early discussions | - | - |
| Evie School | ES-3 | Housing | Public | Burn offset required, drainage impact study needed, Access track upgrades potentially required. Shared foul drainage required | Medium Term | No Progress | - | - |
Figure 15 - Map of Evie School Allocations
IMAGE: Map of Evie School showing allocation sites ES-1, ES-2 and ES-3 along the A966 near Redland and Standpretty, with the school, balancing pond, drains and surrounding land.
Madras Proposals
| Settlement | Site Number | Use | Ownership | Actions needed for delivery | Pipeline for Delivery | Current Stage | Progress Notes | Site/General Notes |
|---|---|---|---|---|---|---|---|---|
| Madras | M-1 | Housing | Private | Upgrades to access points and roads required | Long Term | No Progress | - | - |
| Madras | M-2 | Housing | Private | Upgrades to access points and roads required | Long Term | No Progress | - | - |
| Madras | M-3 | Housing | Private | Upgrades to access points and roads required | Long Term | No Progress | - | - |
| Madras | M-4 | Housing | Private | Water Main within boundary. | Long Term | No Progress | - | - |
| Madras | M-5 | Housing | Private | Water Main within boundary. | Long Term | No Progress | - | - |
| Madras | M-6 | Housing | Private | Junction and road improvements required, visibility issues. Surface Water issues | Long Term | No Progress | - | - |
Figure 16 - Map of Madras Allocations
IMAGE: Map of Madras showing allocation sites M-2 through M-6 around Brough and Harray, with roads, watercourses and surrounding land.
Tingwall Proposals
| Settlement | Site Number | Use | Ownership | Actions needed for delivery | Pipeline for Delivery | Current Stage | Progress Notes | Site/General Notes |
|---|---|---|---|---|---|---|---|---|
| Tingwall | TW-1 | Housing | Private | Watercourse within boundary, flooding and drainage assessment required to ensure no impact on neighbouring development | Long Term | No Progress | - | Potential review as part of next LDP to assess alignment with local living policies |
| Tingwall | TW-2 | Housing | Private | Heritage and Archaeological impact assessment and exploration required to ensure no impact on the broch, potential coastal flooding and erosion issues, requires assessment | Long Term | No Progress | - | Location next to ferry terminal might be more appropriate for non-housing uses as part of review of LDP |
Figure 17 - Map of Tingwall Allocations
IMAGE: Map of Tingwall showing allocation sites TW-1 and TW-2 around Tingwall, the Gorseness Road, coastline and surrounding watercourses.
Hillhead Proposals
| Settlement | Site Number | Use | Ownership | Actions needed for delivery | Pipeline for Delivery | Current Stage | Progress Notes | Site/General Notes |
|---|---|---|---|---|---|---|---|---|
| Hillhead | HH-1 | Housing | Public | - | - | Completed | - | - |
| Hillhead | HH-2 | Housing | Private | Drainage/foul infrastructure for whole site needs to be done. Capacity of Scottish Water drainage requires confirmation | Long Term | No progress | - | - |
| Hillhead | HH-3 | Housing | Private | Drainage/foul infrastructure for whole site needs to be done. Capacity of Scottish Water drainage requires confirmation | Long Term | No progress | - | - |
Figure 18 - Map of Hillside Allocations
IMAGE: Map of Hillhead showing allocation sites HH-1, HH-2 and HH-3 along the B9050 and surrounding land.
Houton Proposals
| Settlement | Site Number | Use | Ownership | Actions needed for delivery | Pipeline for Delivery | Current Stage | Progress Notes | Site/General Notes |
|---|---|---|---|---|---|---|---|---|
| Houton | HT-1 | Housing | Public | Development Brief required. Archaeological/heritage assessment, Drainage assessment, Shared foul sewage infrastructure, Upgrades to road network. | Medium Term | Early discussions | Discussions taken place regarding requirements for planning and infrastructure need | - |
| Houton | HT-2 | Housing | Private | Archaeological/heritage assessment required due to onsite wartime features, potential contamination issues, Drainage assessment, Access to site requires exploration due to ferry terminal access | Long Term | No progress | - | - |
| Houton | HT-3 | Housing | Private | Archaeological/heritage assessment required due to onsite wartime features, potential contamination issues, Drainage assessment, Access to site requires exploration due to ferry terminal access | Long Term | No progress | - | - |
Figure 19 - Map of Houton Allocations
IMAGE: Map of Houton showing allocation sites HT-1, HT-2 and HT-3 around the ferry terminal, Bay of Houton, A964, drains and surrounding land.
Lyron Proposals
| Settlement | Site Number | Use | Ownership | Actions needed for delivery | Pipeline for Delivery | Current Stage | Progress Notes | Site/General Notes |
|---|---|---|---|---|---|---|---|---|
| Lyron | YL-1 | Housing | Private | - | Long Term | No progress | - | - |
Figure 20 - Map of Lyron Allocations
IMAGE: Map of Lyron showing allocation site LY-1 beside the A966, with the settlement, hall, surrounding housing, watercourse and open land.
Norseman Proposals
| Settlement | Site Number | Use | Ownership | Actions needed for delivery | Pipeline for Delivery | Current Stage | Progress Notes | Site/General Notes |
|---|---|---|---|---|---|---|---|---|
| Norseman | N-1 | Housing | Private | - | - | On-site | - | - |
| Norseman | N-2 | Housing | Private | Drainage and foul assessment required - low lying site | Long Term | No progress | - | - |
| Norseman | N-3 | Housing | Private | Drainage and foul assessment required, environmental impact potential on sensitive soils/peatland/biodiversity | Long Term | No progress | - | - |
Figure 21 - Map of Norseman Allocations
IMAGE: Map of Norseman showing allocation sites N-1, N-2 and N-3 along the road network, with drains and surrounding peatland and countryside.
Scapa Brae Proposals
| Settlement | Site Number | Use | Ownership | Actions needed for delivery | Pipeline for Delivery | Current Stage | Progress Notes | Site/General Notes |
|---|---|---|---|---|---|---|---|---|
| Scapa Brae | SB-1 | Housing | Private | Water Main within boundary - investigation with Scottish Water required with potential works | Long Term | No progress | - | - |
| Scapa Brae | SB-2 | Housing | Private | - | Short Term | Application Granted | - | Applications 18/288/PP, 23/082/PP, 22/349/PP, 23/244/PP granted |
| Scapa Brae | SB-3 | Housing | Private | Water Main within boundary - investigation with Scottish Water required with potential works | Medium Term | No progress | - | - |
| Scapa Brae | SB-4 | Housing | Private | - | - | Completed | - | - |
| Scapa Brae | SB-5 | Housing | Private | Water Main within boundary - investigation with Scottish Water required with potential works. Private service pipes also within site, full investigations required | Medium Term | No progress | - | - |
Figure 22 - Map of Scapa Brae Allocations
IMAGE: Map of Scapa Brae showing allocation sites SB-1 through SB-5 around Greenigoe and the A964, with drains, watercourses and surrounding land.
Dalespot Proposals
| Settlement | Site Number | Use | Ownership | Actions needed for delivery | Pipeline for Delivery | Current Stage | Progress Notes | Site/General Notes |
|---|---|---|---|---|---|---|---|---|
| Dalespot | DA-1 | Housing | Private | - | Medium Term | Applications approved | - | Application 18/135/PP and 21/349/PP approved, |
Figure 23 - Map of Dalespot Allocations
IMAGE: Map of Dalespot showing allocation site DA-1 beside the A961, with surrounding roads, drainage and countryside.
Herston Proposals
| Settlement | Site Number | Use | Ownership | Actions needed for delivery | Pipeline for Delivery | Current Stage | Progress Notes | Site/General Notes |
|---|---|---|---|---|---|---|---|---|
| Herston | HE-1 | Housing | Private | - | Medium Term | Early discussions | - | - |
Figure 24 - Map of Herston Allocations
IMAGE: Map of Herston showing allocation site HE-1 near the coast and the B9042, with surrounding open land and settlement.
Lighthouse Corner Proposals
| Settlement | Site Number | Use | Ownership | Actions needed for delivery | Pipeline for Delivery | Current Stage | Progress Notes | Site/General Notes |
|---|---|---|---|---|---|---|---|---|
| Lighthouse Corner | LC-1 | Housing | Private | - | Medium Term | Pre-app | - | - |
| Lighthouse Corner | LC-2 | Housing | Private | - | Medium Term | Pre-app | - | - |
| Lighthouse Corner | LC-3 | Housing | Private | Combined foul/drainage proposals required for proposals. Access upgrades required to be explored. | Medium Term | Pre-app | - | - |
Figure 25 - Map of Lighthouse Corner Allocations
IMAGE: Map of Lighthouse Corner showing allocation sites LC-1, LC-2 and LC-3 beside the B9050 and surrounding roads, drainage and countryside.
Scorradale Proposals
| Settlement | Site Number | Use | Ownership | Actions needed for delivery | Pipeline for Delivery | Current Stage | Progress Notes | Site/General Notes |
|---|---|---|---|---|---|---|---|---|
| Scorradale | SC-1 | Housing | Private | Access requires exploration with potential upgrades likely, shared drainage and foul assessment for shared infrastructure | Long Term | Pre-app | - | High level pre-app discussions held with Landowner |
| Scorradale | SC-2 | Housing | Private | Water course within site boundary, shared drainage and foul assessment for shared infrastructure | Long Term | No progress | - | - |
| Scorradale | SC-3 | Housing | Private | - | Short Term | Application Submitted | - | Application 22/365/PP, awaiting decision |
Figure 26 - Map of Scorradale Allocations
IMAGE: Map of Scorradale showing allocation sites SC-1, SC-2 and SC-3 around Scorradale Road and the A964, with surrounding contours and watercourses.
Schedule 2 - Delivery Programme: Policies
| Policy Number | Policy Name | Action Required? | SG/PPA/DMG | Responsibility | Target Date | Progress | Date Completed | Note |
|---|---|---|---|---|---|---|---|---|
| Policy 1 | Criteria for All Development | |||||||
| Policy 2 | Design | Development Briefs and Design Statements | PPA | Development & Marine Planning, OIC | 2027 | Not Completed | Review as part of LDP - potential integration into next Plan within allocation/settlement plans | |
| Policy 3 | Settlements, Town Centres & Primary Retail Frontages | Town Centre Health Checks | DMG | Development & Marine Planning, OIC | bi-annually | Not Completed | To be completed bi-annually. 2024 last completion | |
| Policy 4 | Business, Industry & Employment | Employment Land Audit | Audit - DMG | Development & Marine Planning, OIC | bi-annually | Not Completed | Last completed 2023 | |
| Businesses out with town centres | DMG | Development & Marine Planning, OIC | 2023 | Completed | September 2023 | Completed in September 2023. | ||
| Business and Industry Land Research and potential Strategy | Development & Marine Planning, Ec Dev, OIC | 2027 | No Completed | Identified as potential evidence gap for the next LDP | ||||
| Vacant and Derelict Land Audit | Audit - DMG | Development & Marine Planning, OIC | annually | |||||
| Policy 5 | Housing | Housing Land Audit | Audit | Development & Marine Planning, OIC | bi-annually | Previewed as part of LDP | 2024 Housing Land Audit complete | |
| Policy 6 | Advertisements & Signs | |||||||
| Policy 7 | Energy | Energy | SG | Development & Marine Planning, OIC | Completed | 2017 | Policy and guidance will be reviewed in line with NPF4 Policy as part of LDP review | |
| Policy 8 | Historic Environment & Cultural Heritage | Historic Environment & Cultural Heritage | SG | Development & Marine Planning, OIC | Completed | 2017 | This SG is statutory after notification to the Scottish Ministers. | |
| Review Conservation Areas and associated Management Plan | PPA | Development & Marine Planning, OIC | Early within the next LDP period | Not Completed | This will cover all the current conservation areas. | |||
| Policy 9 | Natural Heritage & Landscape | Natural Environment | SG | Development & Marine Planning, OIC | Completed | 2017 | This SG is statutory after notification to the Scottish Ministers. | |
| A full review of the Orkney Landscape Character Assessment | DMG | SNH | When required within the lifetime of the Plan | Not Completed | This is a SNH publication and therefore the review is in their hands | |||
| Considering and Including Biodiversity in Development | DMG | Development & Marine Planning, OIC | 2024 | Completed | Completed | |||
| Trees and Woodland | PPA | Development & Marine Planning, OIC | 2025 | In progress | Out for consultation | |||
| Policy 10 | Green Infrastructure | Planning for Open Space and Open Space Audit and Actions | PPA | Development & Marine Planning, OIC | When required within the lifetime of the Plan | Not Completed | 2014 | Initial documents were approved / completed in 2014. They require to be reviewed and updated as part of the next LDP |
| Core Path Plan | DMG | Development & Marine Planning, OIC | 2018 | Complete | Core Path plan was amended in September 2018. | |||
| Play sufficiency Assessment | Development & Marine Planning, OIC | 2027 | Complete | Complete as part of the Evidence Report for LDP | ||||
| Policy 11 | Outdoor Sports, Recreation & Community Facilities | Planning for Open Space, Open Space Audit & Action Programme | PPA | Development & Marine Planning, OIC | Not Completed | Initial documents were approved / completed in 2014. They require to be reviewed and updated. | ||
| Policy 12 | Coastal Development | Orkney Islands Regional Marine Plan | SG | Marine Planning | 2025 | In progress | Consultative Draft produced and consultation complete. | |
| Aquaculture | SG | Development & Marine Planning, OIC | Not Completed | Policy and guidance will be reviewed and will seek alignment with the Marine Plan for the next LDP | ||||
| Coastal Management Plan/Coastal Adaptation Study | PPA | OIC | In Progress | LIDAR works completed. Analysis in early stages. This would be a corporate document, completed with input from several OIC Teams. | ||||
| Policy 13 | Flood Risk, SUDS & Waste Water Drainage | Local Flood Risk Management Plan - second wave | PPA | Development & Marine Planning and Engineering Service, OIC and SEPA | 2022 | Completed | 2022 | Completed 2022 |
| Kirkwall Surface Water Management Plan | Engineering Service (with support from planning) | 2025 | In progress | Work currently underway on Kirkwall catchments and potential capacity within the networks. Completion of consultant work expected May 2025 | ||||
| Drainage and Roads Guidance/Handbook | PPA | OIC (DM, Engineering, Roads) | 2026 | Early stages | Discussions/early works underway to compile Drainage Guidance in relation to Roads to support planning applications | |||
| Policy 14 | Transport, Travel & Road Network Infrastructure | Orkney Local Transport Strategy and Delivery Plan | SG | Transport, OIC | Completed | 2023 | Works from this strategy will feed into the next LDP review process | |
| The Orkney Active Travel Strategy | PPA | Transport, OIC | 2026 | Not Completed | Outlined within the Local Transport Strategy Delivery Plan for 2025/2026 production. Outcomes from this will be fed into the review of the next LDP. | |||
| All Policies | - | Will be monitored against use as part of LDP Review process | - |