Skip to main content

The content below has been generated by an AI model. If anything is unclear, check the source document (opens in new tab) .

Roads Management and Maintenance Plan 2023 - 2028

Appendix 17 – Defect Investigatory Levels

Road Defects and Investigatory Levels Guide

Note – All measurements are in mm.

Carriageway

Investigatory level
Potholes > 150 dia, missing slabs, sunken tracks, failed reinstatements and low, loose or damaged slabs or ironwork> 40
Depression or Hump > 2000 long and 600 wide> 40
IronworkDamaged or Missing
Damaged safety barrierBent, Broken or Missing
Blocked GulliesAll
Flooding, standing water>25
Road SignsDamaged, Faded or Missing
Road Markings or StudsWorn or Missing
VegetationObscuring sight lines or overhanging Carriageway

Footways, Footpaths, Roads in Conservation Areas, Shared Surfaces and Car Parks

DefectInvestigatory level
Potholes > 100mm dia, missing slabs or kerbs, Vertical Projections (Trips), sunken tracks, failed reinstatements and low, loose or damaged slabs or kerbs> 20
Depressions or Humps > 600 wide (subsidence or heave)> 20
IronworkMissing
Damaged Pedestrian Barriers and handrailsBent, Broken or missing
Standing Water > 50% of Footpath width>25
Road SignObstructing Footways, Footpaths or Cycleways.

Public Lighting, Lit Signs or Bollards

All electrical faults will have fixed response times as below to reflect the seriousness of the defect.

Defect
Missing or open doorAll1
Broken or exposed wiring1
Significant structural damage1
Loose Lantern1
Lantern out or missing2